| Identifier | Entry | |
|
scan0001 |
Agenda cover sheet for a Chassis Conference.
| |
|
View original record |
Sg. Hs. Fm. BY. Da. Mx. RHC. Gry. H.R. Smith. L.A. Cx. Hy. Ll. Smith. 1381 BY.1/G.7.1.39. AGENDA FOR CHASSIS CONFERENCE. 9TH. JANUARY 1939. I attach hereto copy of the above Agenda. BY.
| |
|
scan0002 |
Agenda for a chassis conference discussing modifications for the Phantom III model.
| |
|
View original record |
RM's COPY BY.1/G.6.1.39. AGENDA FOR CHASSIS CONFERENCE - 9TH. JANUARY 1939. PHANTOM 111. OIL COOLER. As a result of persistent trouble with the oil coolers, we feel that the only way we can make the…
| |
|
scan0003 |
Publicity, Wraith model modifications, engine vibrations, engine development, and gear ratio performance.
| |
|
View original record |
-2- B.11. BY.1/G.6.1.39. PUBLICITY. The Paulin car is being prepared for Sr's run on an Autobahn. Cx. is arranging for the "Autocar" to send up someone to write up the "Engineering Department".…
| |
|
scan0004 |
Investigation into the Wraith model's performance in relation to its body weight, comparing production and experimental cars.
| |
|
View original record |
-3- WRAITH. BY.1/G.6.1.39. GEAR RATIO RELATIVE TO PERFORMANCE. (c) This subject at Sg's request was completely reviewed in Mx.12/N.24.2.38. and concurred in at a Conference 2.3.38. on the grounds that…
| |
|
scan0005 |
Report comparing performance, costs, and component updates for Wraith and Bentley V models.
| |
|
View original record |
-4- BY.1/G.6.1.39. WRAITH. PERFORMANCE IN RELATION TO BODY WEIGHTS. CONT'D. Comparison of the performance has been made of Mr.Bennett's previous car GBA.4. with that of WXA.27. 42 1/2 cwts. GBA.4 is a…
| |
|
scan0006 |
Progress report on development and testing for the Bentley V, covering pistons, ride, tyres, wheels, and gearbox.
| |
|
View original record |
-5- BY.1/G.6.1.39. BENTLEY V. cont'd. PISTONS. question is certainly promising as a method of improving power without increasing the tendency to detonate. It also has the advantage of enabling us to…
| |
|
scan0007 |
List of criticisms and faults found during testing of the 8.B.V. model in France.
| |
|
View original record |
-6- CRITICISMS OF 8.B.V. IN FRANCE INCORPORATING MX's. (1) VALVE SPRING FAILURES. Weather conditions have prevented high speed testing in France, and we have not experienced faults of this nature on…
| |
|
scan0008 |
Vehicle performance issues and B.V. engine development experiments.
| |
|
View original record |
-7- (6) CHANGE SPEED - STICKNESS IN GEAR SELECTION. This is mainly due to the need for flexibility in the change gear operating shaft due to soft engine mounting. It is somewhat increased if dirt…
| |
|
scan0009 |
Update on B.V. engine test bed work and the Bentley V. Programme production schedule.
| |
|
View original record |
-8- BY.1/G.6.1.39. B.V. ENGINE TEST BED WORK. cont'd. Bentley and the 25/30, we ought to have two valve springs as a safety factor. We have also been checking over camshaft oscillations to see if they…
| |
|
scan0010 |
Material costs and front wing height for the Bentley V model.
| |
|
View original record |
- 9 - BENTLEY V. COST - MATERIAL. It is estimated that Bentley V. material cost will be £210. when ordered in quantities of 500 chassis. The necessary tool cost for this material amounts to…
| |
|
scan0011 |
Programme update for the Bentley 50 car, covering chassis delivery, body mock-up, and part costs.
| |
|
View original record |
- 10 - BENTLEY 50. REVISED PROGRAMME. (a). First B.50 Car. This was available as promised 21.6.38., and considerable work has been done in connection with same in the interim. (b). Second B.50 Car.…
| |
|
scan0012 |
Production programme schedules for the Speed Bentley Paulin Type and the Silver Wraith.
| |
|
View original record |
- 11 - BY.1/G.6.1.39. SPEED BENTLEY - PAULIN TYPE. PROGRAMME. January 17th - Paulin will complete the full scale drawings and hand them to Van Vooren. January 21st - D.O. will complete details by this…
| |
|
scan0013 |
Engine development report for the Bentley 60, detailing issues from a 100-hour endurance test and proposed solutions.
| |
|
View original record |
- 12 - BENTLEY 60. ENGINE DEVELOPMENT. 6-cylinder High Power Unit. Development work is proceeding on this unit with the object of running 100 hours endurance. Various troubles have arisen and are…
| |
|
scan0014 |
Bentley 80 engine development, a special Bentley body, and a handwritten note on standardisation sheets for felt seals.
| |
|
View original record |
- 13 - BENTLEY 80. ENGINE DEVELOPMENT. 8-cylinder High Power Unit. The first unit of this type will have a preliminary run on the Test Bed during week-ending Saturday, January 7th. The weight of this…
| |
|
scan0015 |
Minutes from a Chassis Conference discussing the OM III, Overdrive, and Wraith models.
| |
|
View original record |
1381 DECISIONS TAKEN AT CHASSIS CONFERENCE HELD AT DERBY ON 9th January, 1939. IN RE AGENDA Ref.BY.1/G6.1.39. Cx9/KWI0.1.39. Present: Sg Hs. Rm. BY. Da. Mx. RHC. Gry. H.R.Smith Ll.Smith LA. Cx. Absent…
| |
|
scan0016 |
The status of Wraith and Bentley models, including experimental cars, parts, and features.
| |
|
View original record |
- 2 - WRAITH 1. (cont) mostly due to heavy bodies. The investigation is being continued concerning weight and its relation to performance generally. 2. Experimental Cars. It was mentioned that there…
| |
|
scan0017 |
Meeting notes discussing development issues for the Bentley V and a car for officials for the Bentley 50.
| |
|
View original record |
- 3 - Cx9KW/10.1.39. BENTLEY V. 1. (cont) pressed on the B.V at the start. In that event the design of a box similar to Wraith with the addition of the overdrive has been produced for use in its…
| |
|
scan0018 |
The Bentley 50 model and plans for the Continental Bentley Paulin Type for the Motor Show.
| |
|
View original record |
- 4 - BENTLEY 50. 2. Costs. No further information was forthcoming under this heading, but the matter will be kept on the Agenda. 4. Name - to be kept on the Agenda. 5. Overdrive It was decided that…
| |
|
scan0019 |
Awaiting suggestions for radiator designs.
| |
|
View original record |
-3- Cx9/KWIO.1.39. GENERAL 1. R-R Radiator Design Suggestions awaited - forward.
| |
|
scan0020 |
Agenda for a Chassis Conference correcting a tool cost and providing an update on the Bentley V steering wheel.
| |
|
View original record |
Sg. Hs. Rm. BY. Da. Mv. RHO Cry. H.R.Smith. LA Cx Ry Ll.Smith. HOY/Les. 1381 BY./6/G.10.1.39. AGENDA FOR CHASSIS CONFERENCE - 9TH. JANUARY 1939. B.V. I find that I have made a slip in connection with…
| |
|
scan0021 |
Meeting minutes to settle outstanding details on the specification for the first batch of Standardised Saloon Bodies for Bentley V.
| |
|
View original record |
Rm. 1381 BY.17/N.18.1.39. Minutes of Meeting held in BY's Office on January 18th.1939 to settle outstanding details on the specification of the 1st. batch of Standardised Saloon Bodies for BENTLEY V.…
| |
|
scan0022 |
List of design decisions and component specifications for a vehicle, page 2.
| |
|
View original record |
-2- (3) (BY/RD). The cast tail lamp stem as submitted was not generally liked, and BY/RD. will produce an improved design on the lines suggested by BY. A luggage carrying boot lid we know is…
| |
|
scan0023 |
Typed document outlining specifications and recommendations for various car components.
| |
|
View original record |
-3- Seats. (Ev). The front seats of 9.B.5. as they now are were generally acceptable. The rear seat is still bad and needs experimental development. Ventilation. (Ev. & Rm/FD) It was agreed to…
| |
|
scan0024 |
Minutes from a chassis conference held on January 18th, discussing various B.V. chassis models.
| |
|
View original record |
/381 To Rm. from HPS/WSC. c. By/NS. c. Rm/Swdl. c. FS. HJ. LK. c. AG. FN. TT. CHASSIS CONFERENCE HELD WEDNESDAY JAN. 18th. Personnel present, Rm. Rm/Gry. HPS. By/NS. Rm/Swdl. (part time) FS. HJ. AG.…
| |
|
scan0025 |
Meeting notes or progress report concerning the 14.B.V. (Continental) and 3.B.50 chassis builds.
| |
|
View original record |
-2- 14.B.V. (Continental) continued. c. By/NS. was aksed to give a promise at the next meeting, regarding the details for fixing Armstrong, or Armstrong type Rear Dampers. d. Petrol Tank PD.359.…
| |
|
scan0026 |
Progress report detailing updates and action items for various chassis, engine, and gearbox projects.
| |
|
View original record |
-3- 11.B.V. 12.B.V. and 4.B.50. By/NS. was requested to have the position of the above cars for the next meeting. 29.G.VI. This Chassis is in the shop for the purpose of fitting the B.60. Cast Iron…
| |
|
scan0027 |
Progress report on the development of Wraith gearbox and various engine units.
| |
|
View original record |
-4- Wraith Gearbox adapted to B.V. continued. to the notice of HPS. immediately. ENGINE UNITS. B.80.No.1. On test with new tappets, RHC/Vic. is producing tappets with modified core holes to give…
| |
|
scan0028 |
Requesting the position of outstanding details for Continental Chassis 14.B.V. and Chassis 3.B.50.
| |
|
View original record |
-5- B.V.No.1 Unit.(Continental Chassis 14.B.V.) HPS. requests the position of all outstanding details to complete this unit for the next meeting. W.III. No.9 Unit. (3.B.50. Chassis) HPS. requests the…
| |
|
scan0029 |
Summarizing a conference on engine bearing tests and future material decisions.
| |
|
View original record |
1381 Rm. _Mx._ _RHC/JWW._ _LA._ _Rm/Swdl._ RE: CONFERENCE ON BEARINGS. Present : Rm. Mx. RHC/JWW. LA. Rm/Swdl. I wish to summarise the position discussed at the Conference held in my Office on…
| |
|
scan0030 |
Risks of using AC.9 bearing material and proposing to use AC.7 for 'M' series cars.
| |
|
View original record |
- 2 - BY.11/G.20.1.39. would therefore appear that we are risking another A.C.2 debacle, if we were to introduce AC.9 at this juncture. It has, of course, been tried out on experimental cars, but so…
| |
|
scan0031 |
Minutes of a Chassis Conference held at Derby discussing the Bentley V.
| |
|
View original record |
1381 Roy/Les 5/ER 24.1.39. Chassis Conference held at Derby on 24th January, 1939. Present. Sg. Hs. By. Rm. Ll. Smith Les. Absent. RHO. Bentley V. It was decided that the first series for Bentley V.…
| |
|
scan0032 |
Agreeing to a first batch of 300 chassis, conditional on the Experimental Department's approval.
| |
|
View original record |
1381 S/W To Roy/Les from Sg. Copy to Hs.HY.Rn. LL.Smith.Les.RHC. re B.V. Sg11/E25139 Referring to Roy/Les.5/ER.24.1.39 it is agreed that the first batch shall be 300 chassis and that material can be…
| |
|
scan0033 |
Meeting minutes from an Experimental Production Chassis conference for the Bentley B.5.
| |
|
View original record |
BY/NS.1/G.27.1.39. [Handwritten Note] FTH is page 2 correct? on Yes EH BENTLEY 5. EXPERIMENTAL PRODUCTION CHASSIS CONFERENCE 25.1.39. A Conference was held to review the position of the Experimental…
| |
|
scan0034 |
Specification sheet for a 50 set experimental production run.
| |
|
View original record |
BY/NS.1/G.27.1.39. SPECIFICATION. 50 SETS EXPERIMENTAL PRODUCTION. Sec.No. | Title | LOP. No. | 1st. 50 Exp. Production Chassis. | 250 Production Chassis. | Wraith Type Gearbox. 6151 | Front Brake…
| |
|
scan0035 |
Production status report for various chassis components and their progression.
| |
|
View original record |
- 2 - BY/NS.1/G.27.1.39. | Sec. No. | Title. | LOF. No. | 1st. 50 Exp. Production Chassis. | 250 Production Chassis. | Wraith Type Gearbox. |…
| |
|
scan0036 |
Status table comparing components for experimental and production chassis.
| |
|
View original record |
- 3 - BY/NS.1/G.27.1.39. Sec. No., Title, LOP. No., 1st. 50 Exp. Production Chassis., 250 Production Chassis., Wraith Type Gearbox. 7131, Floorboards.,, Les. to investigate tool question., Not yet…
| |
|
scan0037 |
Status report on various chassis components for experimental and production vehicles.
| |
|
View original record |
- 4 - BY/NS.1/G.27.1.39. Sec.No. | Title. | LOP.No. | 1st. 50 Exp. Production Chassis. | 250 Production Chassis. | Wraith Type Gearbox. ---|---|---|---|---|--- 7166 | Front Stabiliser | FB.3999…
| |
|
scan0038 |
Table outlining specifications and changes for various chassis components across different production runs.
| |
|
View original record |
- 5 - BY/NS.1/G.27.1.39. Sec. No. | Title. | LOF. No. | 1st. 50 Exp. Production Chassis. | 250 Production Chassis. | Wraith Type Gearbox. ---|---|---|---|---|--- 6050 | 2nd. Mot. Shaft. | | Type of…
| |
|
scan0039 |
Table detailing status updates for various components across different chassis and gearbox configurations.
| |
|
View original record |
- 6 - BY/NS.1/G.27.1.39. Sec. No. | Title. | LOP. No. | 1st. 50 Exp. Production Chassis. | 250 Production Chassis. | Wraith Type Gearbox. ---|---|---|---|---|--- 6152 | Front Brake Inter. Shaft. |…
| |
|
scan0040 |
Specification table detailing parts for experimental and production chassis, including the Wraith Type Gearbox.
| |
|
View original record |
- 7 - Sec.No. | Title. | LOP. No. | 1st. 50 Exp. Production Chassis. | 250 Production Chassis. | Wraith Type Gearbox. ---|---|---|---|---|--- 5020 | Spring Drive. | EB.4275 14.12.38. | To LOP. | To…
| |
|
scan0041 |
Specification table detailing part changes across different production chassis and gearbox types.
| |
|
View original record |
- 8 - BY/NS.1/G.27.1.39. Sec.No. | Title. | LOP.No. | 1st. 50 Exp. Production Chassis. | 250 Production Chassis. | Wraith Type Gearbox. --- | --- | --- | --- | --- | --- 5090 | Camshaft & Brgs. |…
| |
|
scan0042 |
Specification table detailing component changes for experimental and production chassis models.
| |
|
View original record |
- 9 - BY/NS.1/G.27.1.39 Sec. No. | Title. | LOP. No. | 1st. 50 Exp. Production Chassis. | 250 Production Chassis. | Wraith Type Gearbox. ---|---|---|---|---|--- 5200 | Oil Fittings. Petrol Fittings. |…
| |
|
scan0043 |
Comparative table of component specifications for experimental and production chassis.
| |
|
View original record |
- 10 - BY/NS.1/G.27.1.39. Sec.No. | Title. | IOP. No. | 1st. 50 Exp. Production Chassis. | 250 Production Chassis. | Wraith Type Gearbox. ---|---|---|---|---|--- 5240 | Controls. | | Design required…
| |
|
scan0044 |
Table comparing specifications for chassis components across production series.
| |
|
View original record |
- 11 - BY/NS.1/G.27.1.39. | Sec. No. | Title. | LOP.No. | 1st. 50 Exp. Production Chassis. | 250 Production Chassis. | Wraith Type Gearbox. | |---|---|---|---|---|---| | 8060 | Automatic Switch. |…
| |
|
scan0045 |
Status table of electrical components for various production chassis.
| |
|
View original record |
- 12 - BY/NS.1/G.27.1.39. Sec. No. | Title. | LOP.No. | 1st. 50 Exp. Production Chassis. | 250 Production Chassis. | Wraith Type Gearbox. ---|---|---|---|---|--- 8100 | Dyno. Field Winding. | |…
| |
|
scan0046 |
Specification sheet detailing production changes for components like lamps, horns, regulator, and petrol pump.
| |
|
View original record |
- 17 - BY/NS.1/G.27.1.39. Sec.No. | Title. | LOP.No. | 1st. 50 Exp. Production Chassis. | 250 Production Chassis. | Wraith Type Gearbox. ---|---|---|---|---|--- 8280 | Lamps & Horns. | | Appearance…
| |
|
scan0047 |
Minutes from a Chassis Conference meeting held on Wednesday, February 1st.
| |
|
View original record |
/ 381 To Rm. from HPS/WSC. o Rm/Swdl By/ NS. [Struck through] o PS. HJ. LK. [Struck through] o AG. FN. TT. [Struck through] HPS/WSC.1/CB.3.2.39. CHASSIS CONFERENCE HELD WEDNESDAY, FEB.1st. Personnel…
| |
|
scan0048 |
Progress report on the B.V. Continental Chassis, detailing outstanding components and actions.
| |
|
View original record |
-2- HPS/WSC.1/CB.3.2.39. 14.B.V. Chassis (Continental) contd. FS. reported that this chassis was progressing satisfactorily. We are still awaiting details for the following :- (a) Armstrong Rear Shock…
| |
|
scan0049 |
Progress report on various chassis, gear box, and engine unit developments.
| |
|
View original record |
-3- HPS/WSC.1/CB.3.2.39. 3.B.50 Chassis. This chassis is ready for the coachbuilder with the exception of the bonnet - By/NS. promised drawings for the rest angles immediately we have received one…
| |
|
scan0050 |
Meeting minutes or progress report on various engine projects detailing component status and action points.
| |
|
View original record |
-4- HPS/WSC.1/CB.3.2.39. B.80 No. 2. FN. stated that this new unit would be ready for test 7.2.39. B.50 No. 3. The crankshaft is due 2.2.39. - AG. reported that the crankcase was some little way off.…
| |
|
scan0051 |
Progress report on various units and chassis, detailing their current status and required actions.
| |
|
View original record |
-5- HPS/WSC.1/CB.3.2.39. B.60 No. 3. It was reported that this unit is ready for test. B.60 No. 4. HPS. requested that AC. & FW. should review the position of this unit with the object of giving a…
| |
|
scan0052 |
Minutes from a chassis conference discussing specifications and production updates for the B.V. model.
| |
|
View original record |
1381 To Rm. from HPS/WSC. CHASSIS CONFERENCE HELD WED.& THURS.FEB.15 & 16. Personnel present HPS.FS.LK.HJ.TF.AG.Rm/Swdl.(engines only) S.B.V.15,000 miles trials. This chassis is to be brought up to…
| |
|
scan0053 |
The 14.B.V. Continental chassis detailing its despatch schedule and a list of required components.
| |
|
View original record |
-2- HFS/WEC.1/BA.20.2.39. 14.B.V. Chassis. Continental. To be despatched to the Coachbuilders by Friday Feb.20th. FS. and TF reported that this would be ready by the above date. The car is due back…
| |
|
scan0054 |
Status report on various chassis specifications, tests, and component fittings.
| |
|
View original record |
-3- HFS/WSC.1/BA.20.2.39. A.B.SO. continued. It must be understood that this chassis is build up with temporary axle, steering, front suspension etc. Correct details should be urged so that same can…
| |
|
scan0055 |
Status report on various engine units, including a Bentley 'S' and B.80 series.
| |
|
View original record |
-4- ENGINE UNITS. Bentley 'S' B.19 Unit. This Unit, received from the Repair Dept. has been completely stripped for 100% inspection. HPS. pointed out that this was a very special unit and was to be…
| |
|
scan0056 |
Status update on various engine units, their components, and testing.
| |
|
View original record |
-5- HPS/WSC.1/BA.20.2.39. B.60.No.2. Fitted to 291G.VI. Rm/Swdl. stated that the flexible flywheel for this unit was very urgently required. HPS. stated that FS. was to arrange to complete the teeth…
| |
|
scan0057 |
Status report on various units, chassis, and their components.
| |
|
View original record |
-63- HPS/WSC.1/BA.20.2.39. B.V.No.4 Unit. contd. the Pistons No.2121 could be completed in 3 weeks. B.V.No.5 Chassis 10.B.V. This Unit will be fitted to 14.B.V. whilst the body is being fitted, when…
| |
|
scan0058 |
Status report on various engine and chassis units, detailing fittings and modifications.
| |
|
View original record |
-7- HPS/WSC.1/BA.20.2.39. W.III.No.6.Unit. Fitted in 27.G.VI. W.III.No.7.Unit. Fitted in 26.G.VI.(Sales Trials) W.III.No.8.Unit. Fitted in 25.G.VI. W.III.No.9.Unit. New Unit originally instructed for…
| |
|
scan0059 |
Agenda for a chassis conference to be held in BY's office.
| |
|
View original record |
1381 BY/Mtn.7/G.25.2.39. BY. Rm. RHC. AGENDA FOR CHASSIS CONFERENCE IN BY'S OFFICE ON MONDAY, THE 27TH. FEB. at 10.0 a.m. Altered Helix Angle of Steering Cam for B.V. Wraith Camshaft. Introduction of…
| |
|
scan0060 |
Minutes of a conference held in BY's office discussing steering cams, camshafts, and ball bearings.
| |
|
View original record |
Rm. 1381 BY.1/N.27.2.39. MINUTES OF CONFERENCE HELD IN BY's OFFICE ON MONDAY THE 27th. FEBRUARY 1939. Present: BY. Rm. RHC. 'Altered Helix Angle of Steering Cam for B.V. RHC. pointed out that no tools…
| |
|
scan0061 |
Meeting notes discussing chassis production, Wraith Gearbox bearings, and future meeting schedule.
| |
|
View original record |
-2- BY.1/N.27.2.39 Cont'd. B.V. RHC. stated it would be satisfactory for production after the first 50 chassis, if the out- standing items were released by the end of March. Wraith Gearbox. RHC.…
| |
|
scan0062 |
Agenda for a chassis conference meeting.
| |
|
View original record |
1381 AGENDA FOR CHASSIS CONFERENCE IN BY'S. OFFICE WITH BY. Rm. & RHC. MONDAY, 13TH. MARCH, 1939. SUBJECT. REMARKS. BENTLEY V. PRODUCTION. Discuss General Position. PAULIN BENTLEY. Discuss…
| |
|
scan0063 |
Progress report on the development and testing of various vehicle electrical components.
| |
|
View original record |
-2- SUBJECT. REMARKS. (2) Ignition Distributor - Scheme 986. Designed for overcoming rubbing block wear & cope with higher speeds. 1 set to be completed ready for Test 23.3.39. (3) Ignition…
| |
|
scan0064 |
List detailing experimental electrical work items for various car models.
| |
|
View original record |
EXPERIMENTAL ELECTRICAL WORK. Ignition Distributor suitable for Wraith, Bentley V and Bentley 50. Scheme D.CD.838 - Issued BY/RD3/B.8.10.38 ( 6 sets). Ignition Distributor suitable for Bentley 60.…
| |
|
scan0065 |
Minutes from an Experimental Production Chassis Conference concerning the Bentley 5.
| |
|
View original record |
1381 BY. Da. Rm. Rm/Gry. ROY/Les. BY/NS.3/G.14.3.39. BENTLEY 5. EXPERIMENTAL PRODUCTION CHASSIS CONFERENCE 10.3.39. Present: BY. Da. Rm. ROY/Les. BY/NS. We were informed that the B.5 Gear Box with…
| |
|
scan0066 |
Minutes of a conference held on March 13th, 1939, regarding Bentley models and chassis work.
| |
|
View original record |
Rm. /381 BY.3/N.15.3.39. MINUTES OF CONFERENCE HELD IN BY's OFFICE - MARCH 13th. 1939. Present BY. Rm. RHC. Bentley V. It was agreed Rm. would be able to issue the specification for Production chassis…
| |
|
scan0067 |
Minutes from a chassis conference regarding the B.V. model trials, production, and specifications.
| |
|
View original record |
1381 To Rm. from HPS/WSC. HPS/WSC.1/BA.20.3.39. CHASSIS CONFERENCE HELD WEDNESDAY 15.3.39. Personnel present HPS. PS. LK. HJ. AG. Rm/Swdl. [Initialed 'Rm' in red ink] 9.B.V. 15,000 miles trials. This…
| |
|
scan0068 |
Status report on various car chassis, outlining completion dates and required parts.
| |
|
View original record |
- 2 - 12.B.V. The remarks as for 11.B.V. also apply to this chassis, with the exception of the tentative date for completion which is April 7th. 14.B.V. Continental. This car is due back from the…
| |
|
scan0069 |
Status update memo on the progress of various gearboxes, valves, shafts, and engine units.
| |
|
View original record |
-3- HPS/WSC.1/BA.20.3.39. MISCELLANEOUS. B.V. Gearboxes - All Helical. Instructions have now been issued for 6 Gearbox Castings, further details are being urged. The second Motion Shaft CB.4817 was…
| |
|
scan0070 |
Progress report detailing the status of various engine and chassis units.
| |
|
View original record |
-4- HPS/WSC.1/BA.20.3.39. B.80.No.4 Unit. New Unit in course of erection - engine to be completely assembled less the crankshaft by the end of the month. B.80.Nos.5 & 6 Conventional. The only work…
| |
|
scan0071 |
Status report detailing the fitting and testing of various numbered units to different chassis.
| |
|
View original record |
-5- HPS/WEC.1/BA.20.3.39. B.V. No.2 Unit. Fitted in 7.B.V.Chassis. B.V. No.3 Unit. Fitted in 1.B.50 Chassis. B.V. No.4 Unit. Fitted in 9.B.V. Chassis. To be brought up to the specification issued for…
| |
|
scan0072 |
Status report on various numbered units, detailing their allocation, fitment, and testing phase.
| |
|
View original record |
-6- HPS/WSC.1/BA.20.3.39. W.III.No.3 Unit. Fitted in 24.G.VI. W.III.No.4 Unit. Test bed unit on test. W.III.No.5 Unit. Fitted in 28.G.VI. W.III No.6 Unit. Fitted in 27.G.VI. W.III No.9 Unit. Allocated…
| |
|
scan0073 |
Agenda for a chassis conference discussing petrol pipes, ignition distributors, the introduction of olives, and experimental work.
| |
|
View original record |
Handwritten (top left): Rm! Handwritten (top center): 1381 AGENDA FOR CHASSIS CONFERENCE IN BY'S. OFFICE WITH BY. Rm. & RHC. MONDAY. 20TH. MARCH. 1939. SUBJECT. REMARKS. PETROL PIPES. Suggest Petrol…
| |
|
scan0074 |
Minutes of a conference discussing petrol pipes, joints, cam wheels, bearings and connecting rods.
| |
|
View original record |
1381 BY.28/N.21.3.39. MINUTES OF CONFERENCE IN BY's OFFICE, ON MONDAY - 20th. MARCH 1939. Present: By. Rm. RHC. RHC/Rd. Petrol Pipes. RHC. exhibited the present petrol pipe and one of modified form,…
| |
|
scan0075 |
Meeting notes discussing chassis experimental work and the distribution of strip reports.
| |
|
View original record |
-2- Chassis Experimental Work. This was discussed, and Rm. suggested the matter be considered at a conference with Hs. By. Rm. RHC. and HPS. This was agreed. Strip Reports. Rm. raised this issue and…
| |
|
scan0076 |
Summarizing points raised at a conference regarding engine development and production.
| |
|
View original record |
1381 To HPS. from Rm/Gry. Rm/Gry.3/MH.23.3.39. With regard to the various points raised at the Conference yesterday afternoon (1) We cannot say at the moment which of the 8-cylinder engines will be…
| |
|
scan0077 |
Minutes from a chassis conference detailing the status of several vehicle builds.
| |
|
View original record |
1381 To [struck through: HPS.] from HPS/WSC. c. Rm. [struck through: c. Rm/Swdl.] [struck through: c. By/NS.] [struck through: d. ER. LK. AG.] [struck through: E. FN. TT.] HPS/WSC.5/PA.25.3.39.…
| |
|
scan0078 |
Status report on various car models detailing their current stage, modifications, and testing progress.
| |
|
View original record |
-2- HPS/WSC.5/BA.25.3.39. 1.B.V. Continental. This car is now at the Coachbuilders and is due back by the middle of April, by which time it is comfirmed the correct parts, as called for in the…
| |
|
scan0079 |
Status report on the development, testing, and assembly of various vehicle chassis and engine units.
| |
|
View original record |
-3- HPS/WSC.S/BA.23.3.39. 7.B.V. On test for general development. 8.B.V. On test for general development 9.B.V. At present on test. Specification has been issued in accordance with the 1st 50…
| |
|
scan0080 |
Progress report on various B.80, B.60, and B.V. units, detailing their status in development, testing, and assembly.
| |
|
View original record |
-4- HPS/WSC.S/EA.25.3.39. B.80.No.5 & 6 Conventional. The only work proceeding on the above is the pattern making for the Crankcase T.H.and the Cylinder Head, all other details are not yet instructed…
| |
|
scan0081 |
Status update on various vehicle units regarding fitment, testing, and modifications.
| |
|
View original record |
-5- HPS/WSC.5/BA.25.3.39. B.V.No.4 Unit. Fitted in 9.B.V. Chassis this unit is to be brought up to date to specification issued for 15,000 miles trials. The Cylinder Block is to be fitted with short…
| |
|
scan0082 |
Status update on urgently required parts including valves, shafts, cylinder heads, and shock dampers.
| |
|
View original record |
-6- HPS/WSC.5/BA.25.3.39. Sodium Filled Exhaust Valves. These valves are very urgently required. AG reported that they are now at grinding. HPS. stated that they are to be brought into the shop for…
| |
|
scan0083 |
Production and testing of forged-to-size connecting rods.
| |
|
View original record |
1381 also 1119 To RHC. from Rm. c. By. Rm.4/MH.25.3.39. FORGED TO SIZE CONNECTING RODS. With reference to By.28/N.21.3.39, coined connecting rods, if as we understand, the dies have not yet been…
| |
|
scan0084 |
Agenda for a chassis conference meeting with handwritten remarks.
| |
|
View original record |
1381 AGENDA FOR CHASSIS CONFERENCE IN BY's. OFFICE WITH BY. Rm. & RHC. MONDAY, 27TH. MARCH, 1939. SUBJECT. REMARKS. PETROL PIPES. Has any decision been made regarding the modified Petrol Pipes. These…
| |
|
scan0085 |
Status update on the production of connecting rods, metal bearings, and arrangement drawings for B.V. & Wraith models.
| |
|
View original record |
-2- SUBJECT. REMARKS. COIN CONN. RODS - B.V. & WRAITH. Messrs. Hardy Spicer have the Die in hand for producing Forgings for the B.V. & Wraith. The Forgings will have approx. .040 surface allowance all…
| |
|
scan0086 |
Announcing a Chassis Conference.
| |
|
View original record |
Hy. By. Rm. RHC. Da. Mx. HPS. LA. Rm/Gry. Hs/LS. 1381 Hs.17/KW.29.3.39. Please note, there will be a Chassis Conference at 10.30 a.m. on Tuesday next, April 4th, in the Board Room. Hs.
| |
|
scan0087 |
Invitation to lunch in connection with Sg's visit to the Works.
| |
|
View original record |
Hy. By, Rm. RHC. Da. Mx. HPS. LA. Roy. Rm/Gry. Hs/LS. c. to Ky. Hs.18/KW.29.3.39. In connection with Sg's visit to the Works next week, will you please join us for lunch on Tuesday, April 4th, at 1…
| |
|
scan0088 |
Minutes of a chassis conference discussing modifications for the Wraith model and other components.
| |
|
View original record |
Ruy 1381 BY.10/G.29.3.39. MINUTES OF CHASSIS CONFERENCE HELD IN BY'S OFFICE - 27.3.39. Present: BY. Rm. RHC. RHC/JRD. WRAITH PETROL PIPES. Drawings are being prepared for a modified petrol pipe, which…
| |
|
scan0089 |
Arrangement drawings for 'B.V.' and the potential 'Wraith Replacement'.
| |
|
View original record |
- 2 - BY.10/G.29.3.39. ARRANGEMENT DRAWINGS FOR B.V. An effort will be made to get the arrangements produced immediately existing urgent work is completed. WRAITH REPLACEMENT. This matter was raised…
| |
|
scan0090 |
Requesting agenda items for an upcoming Chassis Conference.
| |
|
View original record |
Rm. RHC. W/S. (Gx) 1381 URGENT. BY/Mtn.11/G.30.3.39. CHASSIS CONFERENCE. Will you please let me have by tomorrow morning any items you wish to be included in the Agenda for the Chassis Conference on…
| |
|
scan0091 |
Minutes from a chassis conference discussing the progress and allocation of chassis units 10.B.Y. and 11.B.Y.
| |
|
View original record |
To HPS. from HPS/WSC. [Crossed out text: Rm., Rm/Swdl., RH. LK. AG., TB. HL. FN., DD.] /381. HFS/WSC.8/BA.31.3.39. CHASSIS CONFERENCE HELD THURSDAY.30.3.39. Personnel present. HPS. Rm/Gry.…
| |
|
scan0092 |
Progress report on various car chassis, engines, and gearboxes undergoing trials and preparation for coachbuilders.
| |
|
View original record |
-2- 12.B.V. RH. reported that he would have this chassis ready for the Coachbuilders before the Easter recess. Engine Unit is required for this chassis. This car is to represent the first 50…
| |
|
scan0093 |
Status report detailing the testing and development progress of various vehicle units.
| |
|
View original record |
-3- HPS/WSC.8/BA.31.3.39. 6.B.IV. On test for further experience of Overdrive Gear Box. 10 x 43 ratio Axle Gears. (No.B.24 Unit) B.56.B.N. General purpose Car - We understand that this car will…
| |
|
scan0094 |
Assembly and ordering of camshafts for Bentley B.80 units.
| |
|
View original record |
Bentley SO.No.2. -4- (A) HPS/WSC.3/BA.31.3.39. In shop being assembled in accordance with specifications issued in HPS/WSC.6/BA.23.3.39 and HPS/WSC.3/BA.20.3.39. AG. promised completion of the…
| |
|
scan0095 |
Status report on the testing, development, and assembly of various engine units.
| |
|
View original record |
-4- ENGINE UNITS. B.80.No.1. At present on final test prior to fitting to 30.G.VII - Rm/Swdl. stated that it would be ready for fitment in 2 or 3 days time. B.80.No.3. On test for general development.…
| |
|
scan0096 |
Status update on the development, testing, and modification of various B.60 engine units and components.
| |
|
View original record |
-5- HPS/WSC.9/BA.31.3.39 B.60.No.6. contd. a. EB.4512 Camshaft. b. EW.2121 Pistons - Aerolite. B.60 Conventional. The only work proceeding on these units is the pattern for the Crankcase T.H. and the…
| |
|
scan0097 |
Status report on the allocation and fitting of B.V. units to various chassis.
| |
|
View original record |
-6- HTS/WSC.9/BA.31.3.39 B.V.No.1. At present allocated for 14.B.V. Continental Chassis, as previously stated to be reviewed by Rm/Cry. and Rm/Swdl. before we fit. The unit is ready for fitment…
| |
|
scan0098 |
Status update on various development units and all-helical gearboxes.
| |
|
View original record |
-7- HPS/WSC.9/BA.31.3.39. W.III.No.A. Removed from 3.B.50 to be used for development on the test bed. W.III.No.2. On test with Supercharger fitted. W.III.No.4. Test Bed Unit for general development…
| |
|
scan0099 |
Progress report on the production and requirements for various engine and chassis components.
| |
|
View original record |
-8- HPS/WSC.9/BA.31.3.39. B.V.Gear Box, continued. to the notice of HPS immediately. Torsional Indicator Shaft B.60 and B.80. These details are urgently required, all details are promised complete by…
| |
|
scan0100 |
Agenda for a chassis conference discussing steering, whitemetal bearings, and spot-welding.
| |
|
View original record |
138/1 AGENDA FOR CHASSIS CONFERENCE IN BY's. OFFICE WITH BY. Rm. & RHC. MONDAY, 3RD. APRIL, 1939. SUBJECT. STEERING. Discuss question of Steering on Wraith and Bentley Chassis. HOYTS WHITEMETAL…
| |
|
scan0101 |
Progress report on the status of unreleased sections for the Bentley V and a discussion on the Wraith 'D' series release.
| |
|
View original record |
-2- SUBJECT. REMARKS. BENTLEY V. Bentley V. was promised completion by the end of March. The following sections are still however, not released. Engine Section. Gearbox Sections. Exh. Fittings.…
| |
|
scan0102 |
Announcing a Chassis Conference in the Board Room.
| |
|
View original record |
Hy. By. Rm. RHC. Da. Mx. H/S. LA. Rm/Gry. Hs/LS. 1381 Hs.10/KW.6.4.39. Please note, there will be a Chassis Conference at 10.30 a.m. on Tuesday, April 25th, in the Board Room. Hs.
| |
|
scan0103 |
Chassis conference minutes commenting on unit allocation, engine fitting, and a 15,000-mile engine trial.
| |
|
View original record |
/381 LPS/WSO. Rm9/R.8.4.39. CHASSIS CONFERENCE. With reference to WSC.8/BA.31.3.39 - Chassis Conference Minutes - we make the following comments:- New Chassis Instructed. 10.B.V. No. 1 Unit has been…
| |
|
scan0104 |
Requesting agenda items for the upcoming Chassis Conference on Tuesday, April 25th.
| |
|
View original record |
1381 Rm. RHC. W/S. (Ox). BY/Mtn.8/G.12.4.39. CHASSIS CONFERENCE - TUESDAY, APRIL 25TH. Will you please let me have as soon as possible, any items you wish including in the Agenda for the above.…
| |
|
scan0105 |
Minutes of a chassis conference held in BY's office regarding various components.
| |
|
View original record |
Rui. 138/ 12th. April 1939. MINUTES OF CHASSIS CONFERENCE IN BY'S OFFICE WITH BY. Rm. RHC. and RHC./JRD. MONDAY, 3rd APRIL 1939. STEERING. The question of faulty rollers was fully discussed, and it…
| |
|
scan0106 |
Minutes of a chassis conference discussing steering rollers, Silver Ripple, and outstanding items.
| |
|
View original record |
Rm 1381 BY.9/N.17.4.39. MINUTES OF CHASSIS CONFERENCE HELD IN BY'S OFFICE - 17th. APRIL. Present:- BY. Rm. RHC. RHC/JRD. ----------------- Steering Rollers. This matter was discussed in general and…
| |
|
scan0107 |
Postscript authorising HPS to produce six additional gearboxes.
| |
|
View original record |
-2- BY.9/N.17.4.39. P.S. It was agreed to instruct HPS. to produce a further six gearboxes to the present instructions. BY.
| |
|
scan0108 |
Agenda for a chassis conference discussing Wraith, Bentley, and 'Silver Ripple' models.
| |
|
View original record |
1381 AGENDA FOR CHASSIS CONFERENCE IN BY'S. OFFICE WITH BY. Rm. AND RHG. MONDAY. 17TH. APRIL. 1939. SUBJECT. REMARKS. _____________________________________________________________________ STEERING.…
| |
|
scan0109 |
Parts status list for vehicle Frame and Electrical sections, with remarks on a modified component.
| |
|
View original record |
-2- SUBJECT. REMARKS. Frame Section. Cross Steering Tube. All parts. Floorboard & Fittgs. " " Petrol Piping. " " Oil Pipes & Fittgs. " " Pressure Piping. " " Instrument Board. " " Wiring & Fittings. "…
| |
|
scan0110 |
Minutes from a Chassis Conference discussing performance, experimental cars, and specific models like the Wraith and Continental Bentley.
| |
|
View original record |
/381. By. from Rm. Rml/R.19.4.39. CHASSIS CONFERENCE - APRIL 25th. With reference to Cx9/KW.14.4.39., the following are our comments on the various points raised by Cx:- WRAITH PERFORMANCE. These mods…
| |
|
scan0111 |
Minutes from a chassis conference held on 19.04.1939 regarding progress on specific chassis.
| |
|
View original record |
1381. To HPS from HPS/WSC. c. Rm. c. Rm/Swdl. c. RH. DK. AG. c. TB. LL. FN. c. mm. HPS/WSC.8/BA.20.4.39 CHASSIS CONFERENCE HELD WEDNESDAY.19.4.39. Personnel present. HPS. Rm/Gry. Rm/Swdl.(part time)…
| |
|
scan0112 |
Status update report on various chassis, detailing their progress with coachbuilders, testing, and component fitting.
| |
|
View original record |
-2- 12.B.V. This Chassis is now at the Coachbuilders having a body fitted and is due back by the end of the month. The Unit allocated for this chassis is B.V.No.5. LK. reported that the necessary…
| |
|
scan0113 |
Progress report on vehicle and engine development and testing.
| |
|
View original record |
-3- 6.B.V. On test for further experience of Overdrive Gear Box. 10 x 43 xle gears. Fitted with B.24 Unit. 7.B.V. On test for general development. Fitted with B.V.No.2 Unit. 8.B.V. This car is now…
| |
|
scan0114 |
Status report on the development and erection of various engine units and their components.
| |
|
View original record |
-4- EPS/WSC.10/EA.20.4.39. B.80.No.3. On test for General Development. B.80.No.4. New Unit in course of erection. The only outstanding item to complete this unit is the Crankshaft which is in V.C.M.,…
| |
|
scan0115 |
Status report on various B.80 engine units and their components.
| |
|
View original record |
-5- HPS/SC.10/BA.20.4.39 B.80.Conventional. We have now instructed pattern work to proceed and all the necessary new details for this conversion, namely, it should be noted that the T.H.Crankcase and…
| |
|
scan0116 |
Specification list outlining fitment details for various chassis and engine components.
| |
|
View original record |
-6- RPS/WSC.9/BA.20.4.39. B.60.No.5 - contd. (g) WD.4482 Camshaft. (h) CCD.1075 Dynamo having greater flexibility. B.60.No.6. Specification issued for this is similar to B.60.No.5 with the following…
| |
|
scan0117 |
Status report on various engine units, detailing their allocation, testing, and component specifications.
| |
|
View original record |
-7- HPS/WSC.g/BA.20.4.39. W.III.No.1. Removed from 3.B.50 now allocated for development on test bed. W.III.No.2. On test fitted with Supercharger. W.III.No.4. On test for general development. W.III…
| |
|
scan0118 |
Progress report on the manufacturing and testing status of various automotive components including gearboxes, cylinder heads, shock dampers, and camshafts.
| |
|
View original record |
-8- HPS/WSC.9/BA.21.4.39. B.V.Gear Box. All Helical. Both Overdrive and Standard details are now instructed, HPS. stated that the Casting of the last box was to be completely machined by the week-end…
| |
|
scan0119 |
Progress report on the completion status of various engine components for Wraith and Bentley models.
| |
|
View original record |
-9- HFS/WSC.9/BA.20.4.39. Wraith Induction Pipes SCD.1223 (Code W.56) A promise for completion is to be given at the next meeting.EX.S.1537 Induction Pipe. Bentley 60 Induction Pipes SCD.1223 (Code…
| |
|
scan0120 |
Short typed memo postponing the Chassis Conference.
| |
|
View original record |
1381 Hy. By. Rm. RHC. Da. Mx. HFS. LA. Rm/Gry. Hs/LS. Hs.7/KW..2.4.39. Please note, the Chassis Conference has now been postponed until 10.30 a.m. on Wednesday of next week, April 26th. Hs.
| |
|
scan0121 |
Invitation to a luncheon on Wednesday, April 26th, in connection with Sg's visit to the Works.
| |
|
View original record |
Hy. By. Rm. RHC. Da. Mx. HPS. LA. Roy. Rm/Gry. Hs/LS. C. to Ky. Hs.8/K..2..4.39. In connection with Sg's visit to the Works next week, will you please join us for lunch on Wednesday, April 26th, at 1…
| |
|
scan0122 |
Addition to the agenda for a Chassis Conference regarding Wraith production.
| |
|
View original record |
[Stamped Number]: 1381 [Circulation list, all crossed out]: Sg. Hs. Rm. DX. Da. Mr. RHC. Gry. H.R.Smith. LA. Cx. Hy. Ll.Smith. ROY/Les. [Handwritten initials in red ink]: Rm AGENDA FOR CHASSIS…
| |
|
scan0123 |
Agenda for a chassis conference discussing remote control and special overdrive options for the Phantom III.
| |
|
View original record |
BY.1/G.21.4.39. AGENDA FOR CHASSIS CONFERENCE - 25TH. APRIL 1939. PHANTOM III. REMOTE CONTROL. This has been running on 35-EX. for some considerable time. The vacuum arrangement certainly makes gear…
| |
|
scan0124 |
Modifications to the Phantom III 'E' series and addressing a failure of the steering gear.
| |
|
View original record |
- 2 - PHANTOM III. con'td. MODIFICATION TO 'E' SERIES. As production for Phantom III has been put back further, the time has not yet arisen when this need be discussed. FAILURE OF STEERING GEAR. The…
| |
|
scan0125 |
Modifications and engine vibrations for the Wraith model, page 3.
| |
|
View original record |
- 3 - BY.1/G.21.4.39. WRAITH. MODIFICATIONS. Referring to the modifications, which it was agreed should be carried out on 'A' and 'B' series, the position is that the Works have modified 49 chassis in…
| |
|
scan0126 |
Wraith model development, covering engine, gearbox, wheel drivers, and steering.
| |
|
View original record |
- 4 - WRAITH. Cont'd. BY.1/G.21.4.39. ENGINE DEVELOPMENT. I think this item is out of place, and is dealt with under the heading of "DEVELOPMENT". GEARBOX. As the increased reliability of the box has…
| |
|
scan0127 |
The Wraith model, discussing steering wheel production delays, spare parts availability, costs, and rear axle ratios.
| |
|
View original record |
- 5 - BY.1/G.21.4.39. WRAITH. Cont'd. STEERING. Cont'd. NEW STEERING WHEEL. In spite of all the pressure we have been able to bring to bear and the fact that Messrs. Wilmot Breedon are themselves very…
| |
|
scan0128 |
Wraith performance, engine output modifications, and the status of experimental cars.
| |
|
View original record |
- 6 - WRAITH. Cont'd. PERFORMANCE. Cont'd. (b). ENGINE OUTPUT. A number of points were put forward on the basis of which engine power could be slightly increased. These were fitted on the cars run by…
| |
|
scan0129 |
The 50,000-mile test for the Bentley V, detailing engine components including pistons, cold starting, distributors, and valve springs.
| |
|
View original record |
- 7 - BY.1/G.21.4.39. BENTLEY V. 8.B.V. 50,000 MILES TEST. Consideration of Rm.3/R.22.3.39. and Mx.1/MG.15.4.39. ENGINE. PISTONS. We are adopting the type of piston with a raised portion head, which…
| |
|
scan0130 |
The development and issues with the Bentley V gearbox, including synchro mesh, gear selection, and overdrive options.
| |
|
View original record |
- 8 - BY.1/G.21.4.39. BENTLEY V. (cont'd) GEARBOX. (a). We are introducing the universal gearbox with Bentley V. Incorporated in it is a helical first gear, as we have satisfied ourselves that the…
| |
|
scan0131 |
Updates to the Bentley V including accessory drive, ride, tyres, and steering wheel.
| |
|
View original record |
- 9 - BENTLEY V. cont'd. ACCESSORY DRIVE. We are using the lightening type of wheel made in improved Continental Bakelite material, as will be used for future Wraiths. The Metalastik rubber drive has…
| |
|
scan0132 |
Bentley V hand brake jamming, propeller shaft vibration, and chassis production programme.
| |
|
View original record |
- 10 - BENTLEY V. cont'd. JAMMING OF HAND BRAKE RATCHET MECHANISM BY FLYING STONES. This matter has been dealt with by increasing the area and gauge of the guard, but in addition we are investigating…
| |
|
scan0133 |
Status update on Bentley and Silver Wraith models, including bodywork, nomenclature, and production schedules.
| |
|
View original record |
- 11 - BY.1/G.21.4.39. BENTLEY 50. Bodies for the first three cars have been received from Park Wards, and the mockup of the prototype body has been approved. It was agreed at the discussion between…
| |
|
scan0134 |
The status of engine development, radiator design, and interior heating and ventilation systems.
| |
|
View original record |
-12- BY.1/G.21.4.39. ENGINE DEVELOPMENT. This is referred to in Rm.4/R.20.4.39. RR. RADIATOR DESIGN. This matter has not received attention since the last Conference due to more important features…
| |
|
scan0135 |
Listing outstanding parts and modifications for engine units in order of urgency.
| |
|
View original record |
1381 To HPS. from Rm/Swdl. Rm/Swdl.8/MH.25.4.39. Further to the minutes of the Conference, memo HPS/WSC.8/BA.20.4.39, the following is a list of outstanding parts in order of urgency. (1) By an…
| |
|
scan0136 |
Minutes from a Chassis Conference discussing the status and progress of new chassis instructions.
| |
|
View original record |
To. Rm. from HPS/WSC. C. Rm. C. Rm/Swdl C. [REDACTED] AG. C. [REDACTED] FN. C. [REDACTED] WSC Handwritten top: GRY- Please answer any queries on this Rm CHASSIS CONFERENCE HELD WEDNESDAY? 26.4.39.…
| |
|
scan0137 |
Progress report on various chassis, including Continental, Silver Ripple, and test vehicles.
| |
|
View original record |
-2- HPS/WSC.10/BA.27.4.39. 14.B.V. Continental Chassis. This chassis is still at the Coachbuilders in France having the body fitted, it was stated that we can anticipate this being returned somewhere…
| |
|
scan0138 |
Progress report on vehicle testing, development, and modifications for various chassis and components.
| |
|
View original record |
-3- HPS/WSC.10/BA.27.4.39. 6.B.IV. On test for further experience of Overdrive Gear Box 10 x 43 ratio rear axle. Fitted with B.24 Unit. Rm/FJH. stated that he would like SCD.1279 Shear Pins to Side…
| |
|
scan0139 |
Progress report on various cars and engine units undergoing testing and development.
| |
|
View original record |
-4- 25.G.VI. On test for general development Rm's car - fitted with W.III.No.2 Unit. 27.G.VI. On test for general development Mx's car - fitted with W.III.No.6 Unit. 28.G.VI. On test for general…
| |
|
scan0140 |
Meeting notes detailing the progress and parts required for B.80 engine units, including a conventional Bentley 80 version.
| |
|
View original record |
-5- HPS/WSC.10/BA.27.4.39. B.80.No.5. contd. (a) Crankcase T.E.Cylinder EB.4670 AG. reported that this was at the operation milling. (b) Crankshaft EB.4575 HPS. stated that he was anticipating this…
| |
|
scan0141 |
Status report on B.60 series engine units, detailing their components, development stage and chassis fitment.
| |
|
View original record |
-6- HPS/WSC.10/BA.27.4.39. B.60.No.1. On test for general development fitted with Intermediate stage of Cylinder Head EX.S.1383 . B.60.No.2. Fitted in 29.G.VI. B.60.No.3. On test for Development…
| |
|
scan0142 |
Status report on various engine units, their fitment in different chassis, and development progress.
| |
|
View original record |
-7- HPS/WSC.10/BA.27.4.39. B.60.No.6. contd. WSC. was requested to see W.Butterworth to urge the Crankshaft forgings all possible. B.V.No.1 Unit. Fitted to 10.B.V.Chassis. B.V.No.2.Unit. Fitted in…
| |
|
scan0143 |
List of modifications and updates for various engine units including W.R.No.1, W.R.No.12, and 4 Cylinder Units.
| |
|
View original record |
-8- HPS/WSC.10/BA.27.4.39. W.R.No.1. contd. (b) EB.4410 Crankshaft damper. (c) EW.2170 Pistons - Aerolite to SCD.1269. (d) EW.2179 Cylinder Block with EW.2180 Liners. (e) Strengthened Exhaust Valves…
| |
|
scan0144 |
Progress report on the instruction and completion of various automotive components.
| |
|
View original record |
-9- HPS/WSC.10/BA.27.4.39. B.V.Gear Box. All Helical. These boxes are completely instructed, 3 each standard and Overdrive Ratios. As stated in HPS.6/VS.26.4.39 there has been a definite promise made…
| |
|
scan0145 |
Status update on the production and scheduling of various automotive components.
| |
|
View original record |
-10- HPS/WSC.10/BA.27.4.39. Wraith Induction Pipes SCD.1223 (Code W.56.) It was stated that the pattern for this induction pipe would be completed by the 25th. AG. was requested to see that no delay…
| |
|
scan0146 |
Minutes from a chassis conference discussing remote control and special overdrive for the Phantom III.
| |
|
View original record |
1381 DECISIONS TAKEN AT CHASSIS CONFERENCE HELD AT DERBY ON 26th APRIL, 1939, in RE AGENDA Ref. BY.1/G.21.4.39 Cx6/FS.27.4.9. Present: Sg. Hs. C. Rm. BY. Da. Mx. Reid (for RHC) H.R.Smith. Ll.Smith LA.…
| |
|
scan0147 |
Meeting notes discussing steering gear failures on the Phantom III and steering/performance issues on the Wraith.
| |
|
View original record |
PHANTOM III -2- Cx6/ES.27.4.39. 2. (Cont). is to be made to rig up one of these schemes so that it can be tried much sooner than that. 3. Failure of Steering Gear W. have not so far reproduced the…
| |
|
scan0148 |
Meeting minutes discussing weight reduction for 'C'/'D' series, Wraith production issues, and a Bentley V 50,000-mile test.
| |
|
View original record |
WRAITH: 3 (Cont). it was realised that the same results could be attained by reducing the weight of the body. Sg. emphasised that it is the weight of the car that matters and not only the weight of…
| |
|
scan0149 |
The Bentley V model, discussing its gearbox, steering wheel, production status, and cost analysis.
| |
|
View original record |
BENTLEY V. -4- Cx6/FS.27.4.39. 2. Gearbox. It is reported that the B.V. gearbox would not be so silent as those at present in production for 'M' series. It is however believed that the B.V. gearbox…
| |
|
scan0150 |
Status update memo on various engineering and design projects.
| |
|
View original record |
-5- SILVER RIPPLE: It was not thought desirable to include this in the Show programme and the matter is deferred until the next Meeting for further discussion. In the meantime a car of this type will…
| |
|
scan0151 |
Requesting additions to a conference meeting agenda regarding engine components.
| |
|
View original record |
[381] To HPS. from Rm/Swdl. Rm/Swdl.5/MH.1.5.39. Will you please add the following to the Conference notes for discussion at the next meeting, Wednesday, 3rd. May. (1) Connecting rods for Vandervell…
| |
|
scan0152 |
8-cylinder car, 'Silver Ripple' parts, and B.60 engine components.
| |
|
View original record |
1381 HPS. from Rm. Rm7/R.1.5.39. With reference to the Chassis Conference held Wednesday, 26th April, we have already written to you re the 8-cylinder car. With regard to the "Silver Ripple", we send…
| |
|
scan0153 |
Chassis conference meeting minutes discussing new chassis instructions.
| |
|
View original record |
381 To HPS. from HPS/WSC. c. Rm c. Rm/Swdl. c. RH. LK. AG. c. TB. HL. FN. c. TT. CP. CHASSIS CONFERENCE HELD WEDNESDAY 3.5.39. Personnel present : RH. Rm/Gry. Rm/Swdl. LK. TB(part time) AG.(part time)…
| |
|
scan0154 |
Status report on various vehicle chassis, detailing body fittings, engine units, and required parts.
| |
|
View original record |
-2- 12.B.V. This chassis is also at the Coachbuilders and is due back on the 13th, The engine unit for this chassis is B.V.No.5 and is still in 14.B.V. at the Coachbuilders in France. If this unit is…
| |
|
scan0155 |
Progress report on the new Silver Ripple Chassis and updates on various other chassis currently on test.
| |
|
View original record |
-3- Silver Ripple Chassis. This is a new Chassis, the frame being as B.V. Roy/Les is arranging to obtain the first production type frame. Specification has been issued. CHASSIS ON TEST.…
| |
|
scan0156 |
Progress report on the testing, assembly, and parts status of various chassis and engine units.
| |
|
View original record |
-4- HPS/WSC.6/BA.5.5.39. 25.G.VI. On test for general development - Rm's car Wraith III No.8. Unit. 27.G.VI. " " " " - Mx's Car " No.6. " 28.G.VI. " " " " - fitted with " " No.5. " 29.G.VI. " " " " "…
| |
|
scan0157 |
Status update on various B.80 engine units, detailing specific components, development instructions, and timelines.
| |
|
View original record |
-5- HPS/WSC.6/BA.5.5.39. B.80.No.5 contd. (c) Crankshaft Damper to BCD.1246. (d) Cylinder Head EB.4098. (e) Camshaft Ex.33975. (f) Exhaust Valves Ex.33420. (g) Induction Manifolds BCD.1298 details…
| |
|
scan0158 |
Status and component specifications for B.60 series engine units.
| |
|
View original record |
-6- HPS/WSC.6/BA.5.5.39. B.60.No.2. Fitted in Chassis 29.C.VI. B.60.No.3. On test for Development running. B.60.No.4. Fitted in Chassis 3.B.50. B.60.No.5. This is a new unit in accordance with…
| |
|
scan0159 |
Status report on the allocation and testing of B.V. and Wraith III engine units.
| |
|
View original record |
-7- HPS/WSC.6/BA.5.5.39. B.V. Units. B.V.No.1. Fitted in 10.B.V. Chassis. B.V.No.2. Fitted in 7.B.V. " B.V.No.3. " " 1.B.50. " B.V.No.4. " " 9.B.V. " B.V.No.5. At present fitted in 14.B.V. at…
| |
|
scan0160 |
Specifications and component updates for Silver Wraith engine units.
| |
|
View original record |
-9- HPS/WSC.6/BA.5.5.39. Silver Wraith Units. W.R.No.1. New Unit, for which specification has been issued in HPS/WSC.6/BA.14.4.39 3.250 dia bore. - Below is a summary of the main items required. (a)…
| |
|
scan0161 |
Progress report on the development and production of various engine and chassis components.
| |
|
View original record |
-9- HPS/WSC.6/BA.5.5.39. 4 Cylinder Units. To produce this unit we shall convert one of our B.60 units. Details instructed are the Crankshaft EB.4843 and the Camshaft EB.4833 and Conn Rods EB.4847/8.…
| |
|
scan0162 |
Status update on various component projects, including trials, parts manufacturing, and modifications.
| |
|
View original record |
-10- HPS/WSC.6/BA.5.5.39. Front Shock Dampers Cast Iron Casings - contd. 3.B.50 before same goes to France on 15,000 miles trials. It was stated that the castings were being machined outside and LK.…
| |
|
scan0163 |
The status of strengthened E.V. exhaust valves and double valve springs.
| |
|
View original record |
-11- HPS/WSC.6/BA.5.5.39. Strengthened E.V. Exhaust Valves. These are instructed under BA.27/4 on the 24.4.39. AG..reported that he now has the forgings and was requested to give promise of completion…
| |
|
scan0164 |
Minutes from a chassis conference regarding a list of Bentley V production parts not yet released by the drawing office.
| |
|
View original record |
1381 8th. May, 1939. CHASSIS CONFERENCE HELD IN BY's. OFFICE. Monday, 8th. May, 1939. SUBJECT. REMARKS. BENTLEY V. PRODUCTION. The following have not yet been released by the Drawing Office.- Engine…
| |
|
scan0165 |
Note instructing that only 6 sets of the Gearbox Section are to be built.
| |
|
View original record |
-2- SUBJECT. REMARKS. Gearbox Section. Note :- 6 Sets only instructed to be built.
| |
|
scan0166 |
Minutes of a conference discussing outstanding items for B.V., testing procedures, and future production of the P.III.
| |
|
View original record |
13 8/ Rm. RHC RHC/JRD. BY.11/G.9.5.39. MINUTES OF CONFERENCE, HELD IN BY'S OFFICE, MONDAY, MAY 8TH. 1939. Present: BY. Rm. RHC. RHC/JRD. B.V. The outstanding items for B.V. were discussed in detail,…
| |
|
scan0167 |
Minutes from a chassis conference meeting held on Tuesday 16th May 1939.
| |
|
View original record |
1381 To HPS. from HPS/WSC. c. Rm Rm/Swdl. RH. c. LK. AG. TB. WL. c. FN. TT. CP. HPS/WSC.J/BA.17.5.39. CHASSIS CONFERENCE HELD TUESDAY 16.5.39. Personnel present: - RH. LK. TB. AG. CP. FS. FN. TP. WSC.…
| |
|
scan0168 |
Status report on various chassis models, including production, testing, and component shortages.
| |
|
View original record |
-2- HPS/WSC.1/BA.17.5.39 14.B.V. contd. 4.B.50. This chassis is now being despatched to the coachbuilders to have the body fitted. We are still waiting for the details of the Radiator and Bonnet.…
| |
|
scan0169 |
Status report on various chassis undergoing testing and development, detailing component fittings and required modifications.
| |
|
View original record |
-3- HPS/WSC.1/BA.17.5.39. Remarks. 6.B.IV. Chassis on test for further experience of Overdrive Gear Box 10 x 43 ratio rear axle. SCD.1279 Shear Pins for Side Steering Tube. Servo Clutch Mechn. scheme…
| |
|
scan0170 |
Progress report on the testing and development status of various vehicle and engine units.
| |
|
View original record |
-4- HPS/WSC.1/BA.17.5.39. Remarks. 29.G.VI. On test for general development with B.80. No.2 Unit. 30.G.VII. On test fitted with B.80.No.1 Unit, temporarily, pending completion of B.80.No.5. This…
| |
|
scan0171 |
Progress report on various engine components and development units, with remarks on their status.
| |
|
View original record |
-5- HPS/W.C.1/BA.17.4.39. Remarks. B.80.No.5.contd. (f) Exhaust Valves Ex.33420. Forgings now available. AG.anticipates completion in 14 days. (g) Induction Manifolds RCD.1298, details received…
| |
|
scan0172 |
Progress report on new units, detailing component specifications and modifications.
| |
|
View original record |
-6- Remarks. HPS/WJC.1/BA.17.5.39. No.5. This is a new unit for which specification has been issued, since then we have received instructions from Rm/Swdl. which means further modifications to pattern…
| |
|
scan0173 |
Status report detailing the specifications, modifications, and testing of B.V. and Wraith engine units.
| |
|
View original record |
-7- HPS/WSC.1/BA.17.5.39. B.V.No.1 continued. Remarks. (1) Cylinder Block with short inserts. (2) EB.4071 Cylinder Head. Strengthened Exhaust Valves EB.4845 and Double Valve Springs PD.354. (3)…
| |
|
scan0174 |
Update on engine unit fitments and the new specifications for Silver Ripple Units, including a list of main components.
| |
|
View original record |
-8- HPS/WSC.1/BA.17.5.39. Remarks. No.6. Fitted in 27.G.VI. No.8. Fitted in 25.G.VI - Rm's car. No.9. Fitted in 2.B.50. No.10. Allocated for final fitment to 14.B.V. Continental. We are now…
| |
|
scan0175 |
Progress report on the development of various engine, gearbox, and chassis components.
| |
|
View original record |
-9- 4 Cylinder Unit. To produce this unit we shall convert one of our B.60's The details instructed are the Crankshaft FE.4843, Camshaft EB.4833 Conn.Rods EB.4847/8. the conn rods are similar to…
| |
|
scan0176 |
Progress report on the status of various automotive components and associated actions.
| |
|
View original record |
-10- HFS/MSC.1/BA.17.5.39. Remarks. Front Shock Dampers Cast Iron Casings BA.55/1. LK. reported that he would have a set completed by Thursday 18.5.39. These are as instructed for B.V. production. We…
| |
|
scan0177 |
Status update on various automotive components and associated actions.
| |
|
View original record |
-11- HFS/WSC.1/BA.17.5.39. Remarks. Buick type Harmonic Damper SCD.1275. BE.10/2. Details were instructed 17.4.39. AG. promised to complete all details by 20th. Two Leading Shoe Brakes SCD.1280/1.…
| |
|
scan0178 |
Meeting minutes discussing steering faults and proposed improvements for Wraith, 'M' Series Bentley, and Phantom III models.
| |
|
View original record |
1381. B.Rm. BY.3/G.19.5.39. DISCUSSION IN SG'S. OFFICE 15.5.39. Present: Sg. Hs. BY. Rm. (1). STEERING FAULTS. (a). Wraith and 'M' Series Bentley. As previously arranged on BY's recommendation, all…
| |
|
scan0179 |
Development programs for the Phantom and Wraith models, including body production and draughtsman discussions.
| |
|
View original record |
- 2 - BY.3/G.19.5.39. (d). Phantom replacement. Cont'd. object of preventing accidental impacts of fair magnitude twisting the rocker shaft. A weak link is being provided by introducing a bend into…
| |
|
scan0180 |
Requesting agenda items for an upcoming Chassis Conference on June 5th.
| |
|
View original record |
W/S - Cx. Rm. RHC. 1381 BY.17/N.23.5.39. Chassis Conference - June 5th. Will you please let us have as soon as possible any items you wish including in the Agenda for the Chassis Conference referred…
| |
|
scan0181 |
Agenda for the Chassis Conference on June 6th, discussing the Wraith's performance and the Bentley V.
| |
|
View original record |
1381 To Rm.... from By. By.11/N.25.5.39. Chassis Conference - June 6th. ---- The following items have been put forward by Cx. to be included in the Agenda for the above:- WRAITH. Performance. It was…
| |
|
scan0182 |
Test car features, the Silver Ripple model, a rationalised programme, and agenda items for a future meeting.
| |
|
View original record |
-2- 2.B.50. Silver Ripple. As tested by S. (C. and Cx) this did not serve any very useful purpose because the car was not standard as regards many important features. This is brought forward from the…
| |
|
scan0183 |
Chassis conference memo discussing Wraith performance and various Bentley V issues.
| |
|
View original record |
1381 By. from Rm. Rm6/R.27.5.39. CHASSIS CONFERENCE. Replying to By11/N.25.5.39. WRAITH PERFORMANCE. We do not think that there is any further contribution which we can make towards improved perform-…
| |
|
scan0184 |
Page discussing the 'Silver Ripple' model, a rationalised production programme, and vehicle interior development.
| |
|
View original record |
-2- Rm6/R.27.5.39. (8) Silver Ripple. We expect to have completed a French run on this car before the Motor Show. (9) Rationalised Programme. Our main interest in any discussion on this subject is…
| |
|
scan0185 |
Announcing a Chassis Conference meeting.
| |
|
View original record |
Hy. By. Rm. RHC. REC/Rd. Da. Mx. HPS. LA. Rm/Gry. 1381 Hs.7/KW.3.6.39. Rm Please note, there will be a Chassis Conference at 10.30 a.m. on Tuesday next, June 6th, in the Board Room. Hs.
| |
|
scan0186 |
Inviting personnel to a luncheon for a visitor's works visit.
| |
|
View original record |
Hy. By. Rm. RHC. RHC/Rd. Da. Mx. HPS. LA. Rm/Gry. Roy. c. to Ky. Hs.8/KW.3.6.39. In connection with Sg's visit to the Works next week, will you please join us for lunch on Tuesday June 6th, at 1 p.m.…
| |
|
scan0187 |
Cover sheet for the agenda of the Chassis Conference.
| |
|
View original record |
Sg. Hs. Rm. BY. Da. Mx. RHC. Gry. H.R.Smith. LA. Cx. Hy. Ll.Smith. ROY/Les. 1381 BY.5/G.3.6.39. AGENDA FOR CHASSIS CONFERENCE - 6TH. JUNE 1939. I attach hereto copy of the above Agenda. BY.
| |
|
scan0188 |
Chassis conference agenda discussing different remote control gearbox and overdrive options for the Phantom III.
| |
|
View original record |
AGENDA FOR CHASSIS CONFERENCE - 6TH. JUNE 1939. PHANTOM III. REMOTE CONTROL. This particular feature is, of course, not confined to Phantom III. but is one of the main reasons for the production of a…
| |
|
scan0189 |
Phantom III hydraulic transmission and steering gear issues, including rocker shaft and bearing failures.
| |
|
View original record |
PHANTOM III. cont'd. - 2 - HYDRAULIC TRANSMISSION. We have written to Turbo Transmitters Ltd. suggesting as a date for the trial, Thursday or Friday, June 8th and 9th. STEERING GEAR. (a). Failure of…
| |
|
scan0190 |
Modifications, engine vibrations, and steering gear issues for the Wraith model.
| |
|
View original record |
- 3 - WRAITH. MAJOR MODIFICATIONS TO 'A' & 'B' SERIES. We are not waiting for these cars to come in, in the ordinary way, but are getting in touch with the owners and getting them to send the cars in…
| |
|
scan0191 |
The Wraith model's steering, cost, and performance, including criticisms of acceleration and potential engine modifications.
| |
|
View original record |
- 4 - WRAITH. Cont'd. STEERING GEAR (contd). be subjected, by driving over kerbs without damaging any part of the car. Special instructions have been issued to deal with cars which are abroad, the…
| |
|
scan0192 |
Progress report on the Wraith model, discussing performance, cracked valve seats, a specific coupe, and the gearbox.
| |
|
View original record |
- 5 - WRAITH. Cont'd. PERFORMANCE - contd. (c). A reduction in weight of the chassis could be obtained by introducing the Silver Wraith (6 cylinder) following 'C' series. This proposal is outlined…
| |
|
scan0193 |
Steering wheel for the Bentley V and hand brake ratchet protection.
| |
|
View original record |
B.V. Contd. - 6 - STEERING WHEEL. For first series Bentley V. we have introduced the present type of Bentley ll. 'M' series wheel, that is, with three spokes, but with a thinner rim, the rim being the…
| |
|
scan0194 |
Production schedules, performance queries, and modifications for a Drop Head Coupe.
| |
|
View original record |
- 7 - B.V. Cont'd. PRODUCTION POINTS. With reference to Cx's enquiry, as to whether instructions for production are now issued, the position is as follows :- Outstanding items have now been released,…
| |
|
scan0195 |
The status of bodywork programmes for the Bentley Corniche, Silver Dawn, and Silver Ripple models.
| |
|
View original record |
- 8 - BY.1/G.3.6.39. BODYWORK. BENTLEY 'CORNICHE'. The body will be available for inspection on Monday or Tuesday, (June 5th and 6th.) With regard to Exhibitions, all that has been positively…
| |
|
scan0196 |
The development of interior heating and ventilation, including the cost and competitor offerings.
| |
|
View original record |
- 9 - GENERAL POINTS. DEVELOPMENT OF INTERIOR HEATING & VENTILATION. We are under the impression that it is not proposed to supply B.V. with a heater as a part of the standard equipment, but would…
| |
|
scan0197 |
Decisions taken at a Chassis Conference regarding the Phantom III.
| |
|
View original record |
1381 Decisions taken at Chassis Conference held at W. on 6th June, 1939, in re Agenda ref: BY.1/G3.6.39. Cx3/KW7.6.39. Present: Sg. Hs. C. Rm BY. Da. Mx. RHC. H.R.Smith LA Gry. Les Cx. Absent Hs.Hy.…
| |
|
scan0198 |
Steering gear failures and modifications for Phantom III and Wraith models.
| |
|
View original record |
- 2 - PHANTOM III 3. Steering Gear (contd) (b) and shafts of this type fitted at the same time that the new follower rollers are being fitted to P.III's. (c) Failure of bearing rollers which carry the…
| |
|
scan0199 |
Report page discussing cost reductions, performance, and engineering issues concerning valve seats, gearbox, and steering wheel for the B.V. model.
| |
|
View original record |
- 3 - 3. Cost. RHC indicated that the allowed hours had been reduced from 3479 at a labour cost of £158. to 3120 at a labour cost of £120. 4. Performance. It was agreed that no further changes to…
| |
|
scan0200 |
Meeting notes discussing steering wheel cost, performance, Drop Head Coupe bodies, and the Bentley 'Corniche'.
| |
|
View original record |
- 4 - B V. 3. Steering Wheel (contd) the production of a cellulose acetate wheel is one of cost. 4. Cost - Carried forward to the next Meeting. 5. Performance Rm rather reversed EY's remark that it…
| |
|
scan0201 |
Meeting memorandum discussing the standardization of interior heating and a rationalized production programme for Wraith and Phantom III chassis.
| |
|
View original record |
- 5 - GENERAL 1. Interior Heating It was decided that on principle we ought to standardise a heater in all Wraiths and P.III's, and that if the demand indicated the necessity of supplying it on B V,…
| |
|
scan0202 |
Arrangements for the upcoming Monday's conference due to a colleague's hospital visit.
| |
|
View original record |
He. [struck through] c. Rm. 1381 BY.2/G.10.6.39. MONDAY'S CONFERENCE. I am having to collect Alec. from Central London Hospital, where he has been having a further operation to try and clear the air…
| |
|
scan0203 |
Minutes from a chassis conference detailing completion schedules and parts shortages for various car models.
| |
|
View original record |
[Handwritten note top center]: 1381. [Signature: Clark?] FSH To Ton. sleh wants belts for 3567 page 11 as on an felly nd of the car [Typed text]: To HPS. from HPS/WSC. c. Rm/Swdl. RH. [Rm is circled…
| |
|
scan0204 |
Status update on various chassis and components for car production and testing.
| |
|
View original record |
-2- HPS/WSC.2/BA.12.6.39. Remarks. A complete shortage has been compiled, this is to be carefully checked over and the office informed of any details that will require re-ordering. Silver Ripple…
| |
|
scan0205 |
Test report detailing modifications, development status, and requirements for various cars on test.
| |
|
View original record |
-3- HPS/WSC.2/BA.12.6.39. Remarks. 2.B.V. On test for general development. Fitted with B.V.No.3 Unit. B.I. Rebuilt after 50,000 miles trials, despatched to coachbuilders 8.6.39. Fitted with B.V.No.7…
| |
|
scan0206 |
Status report on various vehicle and engine units, including planned modifications for upcoming trials.
| |
|
View original record |
-4- HPS/WSC.2/BA.12.6.39. Remarks. 28.G.VI. On test for general development fitted with W.III.No.5 Unit. 30.G.VII. Silver Wraith. Required for 30,000 miles trials in France. We are to incorporate the…
| |
|
scan0207 |
Specifications for new engine units B.80 No.5, No.6, and No.7, detailing required components.
| |
|
View original record |
-5- HPS/WSC.2/BA.12.6.39. Remarks. To be completed as quickly as possible by using the Crankshaft, Camshafts etc from B.80. No.4 Unit, as instructed in HPS/WSC.8/BA.7.6.39. B.80.No.5. New Unit…
| |
|
scan0208 |
Specification sheet detailing parts and status for B.80, Conventional 8, and B.60 cast iron engine units.
| |
|
View original record |
-6- HPS/WSC.2/BA.12.6.39. B.80.No.7 - contd. 5. Ex.33420 Exhaust Valves, solid stems. 6. EB.4512 Camshaft. 7. EB.4838 Inlet Pipes for small bore Carb. 8. Rm.576 Flywheel. Conventional 8 No.1 Unit. New…
| |
|
scan0209 |
Specification sheet detailing component changes for B.60 and Bentley V units.
| |
|
View original record |
-7- B.60.No.5. New Unit in accordance with specification HPS/WSC.1/BA. 5.4.39. The main items being. 1. EB.4919 Crankcase T.H. & Cylinder. 2. EB.4685 Crankshaft. 3. SCD.1043 Crankshaft Damper. 4.…
| |
|
scan0210 |
List of specifications and statuses for various B.V. and Wraith III engine units.
| |
|
View original record |
-8- HPS/WSC.2/BA.12.6.39 B.V.No.1 contd. Remarks. 1. Cylinder Block with short inserts. 2. EB.4071 Cylinder Head. 3. Strengthened Exhaust Valves EB.4845. 4. Standard Production Induction System. 5.…
| |
|
scan0211 |
Progress report on the testing, fitting, and development of various engine units.
| |
|
View original record |
-9- HPS/WSC 2/BA.12.6.39. Remarks. Passed to test 12.6.39 fitted with new set of split skirt pistons. Connecting Rods with Vandervell Brgs. Double valve springs to Nos.4,5, & 6 Cylinders. W.III.No.4.…
| |
|
scan0212 |
Progress report detailing component production, modifications, and completion promises for various units.
| |
|
View original record |
-10- HPS/WSC.2/BA.12.6.39. W.R.No.1 continued. Remarks. e. EW.2179 Cylinder Block. f. EW.2180 Cylinder Liners. g. EB.4845 Exhaust Valves to PD.403. h. Ex.S.768 Camshaft. i. SCD.1038 Oil Filter.…
| |
|
scan0213 |
Progress report on parts including Phantom III steering, induction pipes, and special wheel nuts.
| |
|
View original record |
-11- HPS/WSC.2/B.12.6.39 Phantom III Steering. Strengthened Pendulum Lever F.89869 and F.89870 Rocking Shaft are urgently required for fitment to Ch.No. also a set for W.Bell's test rig. E.80…
| |
|
scan0214 |
Minutes from a Chassis Conference discussing issues with the Bentley V, Corniche model, and various components.
| |
|
View original record |
SECRET. 1381. Les.1/B.16.8.39. Minutes of Chassis Conference held in the Board Room on Monday, 14th August, 1939. Present - Hs. By. RHC. Les. Hs/LS. RHC/JRD. RHC/McC. Absent - Rm. Bentley V. It was…
| |
|
scan0215 |
Starter motor costs and revised production schedules for Phantom III, Bentley V, and Wraith models.
| |
|
View original record |
-2- Starter Motors (Contd:) RHC. and RHC/JRD. were optimistic that a large reduction in cost was possible for our own starter motor, particularly when no reduction gear was required. Apparently the…
| |
|
scan0216 |
Meeting minutes from a chassis conference held on 13.6.39.
| |
|
View original record |
1381 To HPS. from HPS/WSC. c. Rm/Swdl. RH. c. LK. AG. TB. HL. c. FN. TT. JM. BI. c. CP. HHS/WSC.1/BA.19.6.39 CHASSIS CONFERENCE HELD 13.6.39. Personnel present: RH. LK. TB. AG. CP. FN. TF. JM. BI.…
| |
|
scan0217 |
Progress report on chassis and parts for Silver Ripple, Silver Wraith, Silver Dawn, and Bentley models.
| |
|
View original record |
-2- HPS/WSC.1/BA.19.6.39. Remarks. A complete shortage list has been compiled, this is to be carefully checked over and the office informed of any details that will require reordering. H. stated that…
| |
|
scan0218 |
Status report on various test cars, detailing components fitted, current status, and required modifications.
| |
|
View original record |
-3- HPS/WSC.1/BA.19.6.39. Remarks. 12.B.V. Fitted with Wraith Ripple No.2 Unit. It is now decided that this car will be used for 15,000 miles tests, fitted with all Ripple features, except the…
| |
|
scan0219 |
Status report on vehicle and engine units undergoing testing and development.
| |
|
View original record |
-4- HPS/WSC.1/BA.19.6.39. Remarks. 27.G.VI. On test for general development fitted with W.III.No.6 Unit - Mx's Car. 28.G.VI. On test for General Development fitted with W.III No.5 Unit.…
| |
|
scan0220 |
Progress report on various engine units (B.80 series), detailing specifications, parts, and trial status.
| |
|
View original record |
-5- HPS/WSC.1/BA.19.6.39. B.80.No.4 continued. Remarks. same to B.80.No.5 Unit in connection with 30,000 miles trials see, HPS/WSC.8/BA.7.6.39. Specification for rebuilding has been issued. B.80.No.5.…
| |
|
scan0221 |
Specification list and update on various engine units and their components.
| |
|
View original record |
-6- B.80.No.7 Unit contd:- 2. EB.4575 Crankshaft, nose end to EB.4101. 3. EB.3916 Standard Aerolite pistons with tin plated rings as B.V. production. 4. EB.4098 Cylinder Head. 5. Ex.33420 Exhaust…
| |
|
scan0222 |
Status update and parts list for various B.60 engine units under development.
| |
|
View original record |
- 7 - Remarks. HPS/WSC.1/BA.19.6.39. B.60.No.3. On test for Development running. B.60.No.4. Fitted in 3.B.50 Chassis. B.60.No.5. New Unit in accordance with specification HPS/WSC.1/BA.5.4.39. The main…
| |
|
scan0223 |
Log of Bentley V units, their chassis fitment, and remarks on a standard conversion specification.
| |
|
View original record |
-8- BENTLEY V UNITS. B.V.No.1. Fitted in 10.B.V. B.V.No.2. Fitted in 7.B.V.Chassis. B.V.No.3. Fitted in 1.B.50.Chassis. B.V.No.4. Fitted in 9.B.V.Chassis. B.V.No.5. Removed from 14.B.V.Chassis.…
| |
|
scan0224 |
Status report on Wraith III and Wraith Ripple engine units, detailing testing, modifications, and component parts.
| |
|
View original record |
-9- Wraith III Units. W.III.No.1 - On test for general development. W.III.No.4.- On test for general development. W.III.No.5. - Fitted in 28.G.VI. W.III.No.6. - Fitted in 27.G.VI. W.III.No.8. - Fitted…
| |
|
scan0225 |
Progress memo detailing the status of various automotive components like 4-cylinder units, gearboxes, and induction pipes.
| |
|
View original record |
-10- HPS/WSC.1/BA.19.6.39 4 Cylinder Unit. This newUnit is being produced by converting one of the existing B.60 Units. Promises are required for the following. EB.4848 C'Shaft promised by Shardlows…
| |
|
scan0226 |
The B.V. Induction System, detailing the urgent requirement for a new inlet pipe and instructions for Continental sets of parts.
| |
|
View original record |
-11- HPS/WSC.1/BA.19.6.39. B.V. Induction System ECD.1382 Code ECD.1382. EB.4995 Inlet Pipe. 6 Continental Sets of parts. Special details are instructed under code BA.100 - all of these parts to be…
| |
|
scan0227 |
Test log with component specifications and requirements for a Bentley 50 Chassis.
| |
|
View original record |
Bentley 50 Chassis on Test. 1.B.50. On test for General Development. Fitted with B.V. No.3 Unit. 2.B.50. On test for General Development. Fitted with GL.892 New Depatrue Seal Centre Bearing -…
| |
|
scan0228 |
Minutes of a works conference on chassis, detailing cost analysis for front suspension and frames.
| |
|
View original record |
1381 To: Hs. Rm. RHC. ROY/Les. RHC/Mr.Reid. BY.3/G.21.6.39. WORKS CONFERENCE ON CHASSIS. HELD 19TH. JUNE 1939. Present: Hs. BY. Rm. RHC. ROY/Les. RHC/Mr.Reid. MAIN SUBJECT OF CONFERENCE : FRONT…
| |
|
scan0229 |
Material cost for Bentley V. Brakes and planning for future sections like the Rear Axle and Starter Motor.
| |
|
View original record |
- 2 - BY.3/G.21.6.39. BENTLEY V. BRAKES. This is to be considered this week in detail from the material cost point of view by BY. and Rm, in conjunction with a Works man earmarked for the job by RHC.…
| |
|
scan0230 |
Meeting notes discussing chassis costs for the Bentley V and modifications for the B.V. crank.
| |
|
View original record |
1381. RM Hs./LS.E/T.26.6.39. Notes of Meeting held Monday June 26th, to discuss Chassis Costs. Present:- Hs. BY. RHC. Rm. JRD Les. Hs/LS. JRD. said that he hopes to have the cost analysis of the…
| |
|
scan0231 |
Progress report discussing B.V. material delays and B.V. gear box complaints.
| |
|
View original record |
Hs./LS.2/T.26.6.39 -2- B.V Progress. RHC. said he was not satisfied with the progress of B.V, due to delay in the deliveries of certain materials. The material for fly wheel disc was a case in point,…
| |
|
scan0232 |
Minutes from a Chassis Conference meeting discussing personnel and model updates.
| |
|
View original record |
1381 To HPS. from HPS/WSC. c. Rm/Swdl. RH. c. LK. AG. TS. HL. c. FN. TT. JM. RI. c. CP. HPS/WSC.1/BA.26.6.39. CHASSIS CONFERENCE HELD 20.6.39. Personnel present RH, LK, AG, CP, FN, TF, JM, BI, WSC,…
| |
|
scan0233 |
Specifications for new Silver Dawn chassis and status updates on various Bentley models on test.
| |
|
View original record |
-2- Silver Dawn 60 32.G.VII. Specification for this new chassis to be issued To be fitted with a Cast Iron 6 Cylinder Unit. Silver Dawn 80 32.G.VII. Specification for this new chassis to be issued. To…
| |
|
scan0234 |
Status report on various Bentley and Wraith test cars, detailing specifications, test progress, and parts.
| |
|
View original record |
-3- HPS/WSC.1/BA.26.6.39. Remarks. 11.B.V. 11 x 41 Rear Axle Gears in S/ZNCR. are required for this car, fitted with B.80.No.3 Unit. Gears are now available for fitment. 12.B.V. Fitted with Wraith…
| |
|
scan0235 |
Requirements for trials in France for a Silver Wraith and on-test status for Bentley 50 Chassis and 80 Engine units.
| |
|
View original record |
-4- HFS/WSC.1/BA.26.6.39. 30.G.VII. Silver Wraith. Required for 30,000 miles trials in France. Anticipate passing to test complete to specification for 30,000 miles 26.6.39. Remarks. We are to…
| |
|
scan0236 |
Status report on Bentley 80 Units, covering development testing, modifications, and specifications for new builds.
| |
|
View original record |
-5- HPS/WSC.1/BA.26.6.39. Remarks. Bentley 80 Units - contd. No.2. On test for general development. Fitted with Camwheel having .020 backlash and torsional indicator. No.3. Fitted in 11.B.V. Chassis.…
| |
|
scan0237 |
List of parts and specifications for various engine units with remarks on their development status.
| |
|
View original record |
-6- B.60. Units - contd. No.7 contd. 1.EB.4670 Crankcase T.H. and Cylinder. 2.EB.4575 Crankshaft, nose end to EB.4101. 3.EB.3916 Standard Aerolite pistons with tin plated rings as B.V. production.…
| |
|
scan0238 |
Status update and specification list for B.80 and Bentley V engine units.
| |
|
View original record |
-7- HFS/WSC.1/BA.26.6.39. B.80 Units - contd. No.3. On test for Development running. No.4 Fitted in 3.B.50 Chassis. No.5. New Unit in accordance with specification HPS/WSC.1/BA.5.4.39. The main items…
| |
|
scan0239 |
Status report on Bentley V and Wraith III engine units, detailing their components, tests, and chassis fittings.
| |
|
View original record |
-8- Bentley V Units - contd. No.1 continued. No.2. Fitted in 7.B.V.Chassis. No.3. Fitted in 1.B.50 Chassis. No.4. Fitted in 9.B.V. Chassis. No.5. Removed from 14.B.V. Chassis. No.7. Refitted to 8.B.V.…
| |
|
scan0240 |
Status update on Wraith Ripple Units, 4 Cylinder Units, and Helical Gear Boxes.
| |
|
View original record |
-9- HPS/WSC.1/BA.26.6.39. Wraith Ripple Units. Remarks. W.R.No.1. New Unit instructed in HPS/WSC.6/BA. 14.4.39 3.250 dia bore - The main items being, a. Crankcase T.H. in L.5. alloy. b. Crankcase L.H.…
| |
|
scan0241 |
Progress report on the production and requirements for various vehicle components, including steering, induction pipes, and pulleys.
| |
|
View original record |
-10- Phantom III Steering. Strengthened Pendulum Lever F.89869 and F.89870 Rocking Shaft are urgently required for fitment to 35-Ex. also a set for W.Bell's test rig. B.80 Induction Pipes ECD.1292…
| |
|
scan0242 |
List of required actions for revised pulleys, a gearbox, camshafts, and a Wraith spring drive.
| |
|
View original record |
-11- Hgs/WSC.1/BA.26.6.39. B.60 Revised Cast Pulleys Code BC.12. EB.4692 Fan Hub A/C. EB.4693 Fan Hub I/C. EB.4960 Double Pulley A/C. EB.4961 Double Pulley I/C. EB.4964 Water pump pulley I/C. DB.2448…
| |
| | | |