Centralised chassis lubrication for the Phantom pendulum lever, referencing scheme 2618.
| Identifier | WestWitteringFiles\S\2April1928-June1928\ Scan116 | |
| Date | 31th May 1928 | |
| BY. {R.W. Bailey - Chief Engineer} FROM DA. {Bernard Day - Chassis Design} C. to BY. {R.W. Bailey - Chief Engineer} HS. {Lord Ernest Hives - Chair} INDIA(Production 20 HP. with 4-speed box and Front Wheel Brakes) 3. - CENTRALISED CHASSIS LUBRICATION. DA {Bernard Day - Chassis Design} 2/M31.5.28. X3806 X5430 X Herewith we send N. sch. 2618. shewing the lubrication of the pendulum lever on the lines of the Phantom. We have preferred to do the drip arrangement with a large pipe rather than try to make a sealed connection. So far we have had no adverse reports as to this arrangement on the Phantom. DA. {Bernard Day - Chassis Design} | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).