Rolls-Royce Archives
         « Prev  Box Series  Next »        

Confirming the supply of information for a general arrangement drawing of the 'Myth'.


Identifier  ExFiles\Box 109\3\  scan0046
Date  12th December 1940
  
Ev {Ivan Evernden - coachwork} /JD. {J. Draper - Frames} from Rm. {William Robotham - Chief Engineer}

c. Rp/HH.

700

Rm. {William Robotham - Chief Engineer} 11/ML.12.12.40. 1030

GENERAL ARRANGEMENT DRAWING

MYTH.

This is to confirm that you are going to supply one of Rm {William Robotham - Chief Engineer} /HH's men with the information necessary to enable him to make a general arrangement drawing of the Myth.

It is important that we should have this drawing by January 1st. 1941.

Rm. {William Robotham - Chief Engineer}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙