Rolls-Royce Archives
         « Prev  Box Series  Next »        

Statement on the minimum time required for production preparation, noted as four and a half months.


Identifier  ExFiles\Box 98\1\  scan0303
Date  21th October 1941
  
- 2 -

The minimum time required to prepare for pro-
duction, dealing with the work as set out above, would be 4 1/2 months.

Rm {William Robotham - Chief Engineer} /EAG.

21.10.41.
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙