Rolls-Royce Archives
         « Prev  Box Series  Next »        

Correcting a fault where two gears were meshing simultaneously in the 25 HP synchromesh gearbox.


Identifier  ExFiles\Box 104\4\  scan0059
Date  26th October 1931
  
X5310

P. [crossed out]
cr. {Mr Cra’ster / Mr Chichester} Wor. {Arthur Wormald - General Works Manager} [crossed out]
cr. {Mr Cra’ster / Mr Chichester} DA {Bernard Day - Chassis Design} [crossed out]
c. Hs. {Lord Ernest Hives - Chair}

BY.10/G. 26.10.31.

25 HP. SYNCHROMESH GEARBOX.
----------------------------

Referring to the trouble described in the last paragraph of Hs {Lord Ernest Hives - Chair} /Gry. {Shadwell Grylls} 1/AT.24.10.31., which is encountered in trying to engage gears, we had noticed some weeks ago that two gears had been shown meshing at the same moment. This, we at once corrected by making the 50 thou. allowance referred to in the above memo.

BY. {R.W. Bailey - Chief Engineer} BM
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙