Cost estimate and comparison for a Wraith Flywheel and Clutch scheme.


Identifier  ExFiles\Box 8\1\  01-page26
Date  10th December 1936
  
To Rm. {William Robotham - Chief Engineer} from G {Mr Griffiths - Chief Accountant / Mr Gnapp} /Rb. {R. Bowen}
c.c. to HHG.
c.c. to E {Mr Elliott - Chief Engineer} /Lid. {A. J. Lidsey}

612 10th G {Mr Griffiths - Chief Accountant / Mr Gnapp} /Rb. {R. Bowen} 5/H/73/W.111236.

L E SMITH Please discuss
Rm. {William Robotham - Chief Engineer}

Wraith Flywheel and Clutch
N. Sch.4882 and LOP.GW.962.

In reply to E {Mr Elliott - Chief Engineer} /Lid. {A. J. Lidsey} 2/HP.3.12.36. regarding detail and complete costs of the above scheme, we find our estimates are as follows:-

Material Labour
£. s. d. {John DeLooze - Company Secretary} £. s. d. {John DeLooze - Company Secretary}
(1) Flywheel as shown on N.Sch.4882. 1 3 0 6 2 1.9.2
(2) Starter Ring Gear " " " 1 8 0 5 7½ 1.13.7½
(3) Flywheel with Starter Ring Gear
and Bearing Housing integral
material S/HC. as present 25/30HP. 13 6 10 4 1.3.10
(4) Scheme complete (N.Sch.4882)
(GW.962). 6 2 10 2 0 8
(5) Present 25/30HP. to LOP. G57097. 4 4 2 1 17 6

In view of the extra cost of the Wraith to N.Sch.4882 over the present 25/30HP., please let us know if you are proposing to modify the Wraith design.

G {Mr Griffiths - Chief Accountant / Mr Gnapp} /Rb. {R. Bowen} CM
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙