Cover letter for a Wraith III coachwork chassis print, noting the requirement for an additional scuttle isolation drawing.
| Identifier | ExFiles\Box 7\5\ X 604 Body-page181 | |
| Date | 17th February 1938 | |
| C. Rm. {William Robotham - Chief Engineer} DA. {Bernard Day - Chassis Design} 8/G.17.2.38. WRAITH III. COACHWORK. 604 scheme :- Please receive herewith the following F.CD.479 Wide Frame 25/30 HP. Chassis Print. The above drawing shews the particulars necessary to enable the coachbuilders to produce bodies. Will BT {Capt. J. S. Burt - Engineer} /HRB. please check this drawing before issuing. A scuttle isolation drawing shewing the Sepak will also be required to be used in conjunction with this drawing. DA. {Bernard Day - Chassis Design} [Handwritten initial] ED {J. L. Edwards} [Handwritten signature] | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
