Work schedule for the Chassis S/C Unit, detailing tests, time allocation, and required spares.


Identifier  ExFiles\Box 134\1\  scan0012
Date  10th August 1937
  
TO HPS. {Horace Percy Smith - Experimental Factory Mgr}
c. to Rm {William Robotham - Chief Engineer} /Swdl. {Len H. Swindell}
1129
Rm {William Robotham - Chief Engineer} /Ed. {J. L. Edwards} 1/JH.10.8.37.

Chassis S/C Unit.

Running time for fortnight ending 7th Aug. 1937.
Fitting time for fortnight ending 7th Aug. 1937.

Work to be done.
time.

Power and detonation on inclined valve head with l/C. block on C.R.6.4
1 day.

Effect of valve timing on back pressure and power loss, the effect of duration and phase on the back pressure being noted.
6 days.

Compression pressure tests.
4 days.

SPARES.
(1) Valve gear details for H power heads.
(2) Bottom tappets for H power unit.
(3) Re-conditioned T.H.

Rm {William Robotham - Chief Engineer} /Ed. {J. L. Edwards}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙