Rolls-Royce Archives
         « Prev  Box Series  Next »        

Tabulated report detailing component failures, their operational run time, and associated remarks.


Identifier  WestWitteringFiles\C\August1919\  Scan56
Date  26th April 1917
  
SECTION. FAILURES. TIME RUN. REMARKS.
SPRINGS. Centre Bolt. 4 hrs. 13 mins.
" " 6 " 9 "
" " 2 " 29 "
" Spring Clips. 1 " 33 "
" " 3 " 29 "
" " 7 " 59 "
" Top Leaves 4 " 12 " Reported material poor.
" " 5 " 36 " Crack starting a central hole.
" " 5 " 36 "
STEERING. Column. 2 " 46 " Both broken just above flange on steering box.
" " 5 " 8 "
" Rocking Lever in Box. 1 " 39 " Reported previously.
" Bottom O.S. Steering Arm 7 " 59 " Broken about .5" from ball end. Brinell 257 - Analysis O.K.
RADIATOR. Marstons - standard. 6 " 44 " One tube collapsed. This has been taken up with the Makers who promise to report.
FRAME. Side member. 9 " 48 " Fractured at the radiator suspension bracket O.S. The fracture travels through two bolt holes and bolt hole on the under-side which fixes the rubber buffer.
FRONT AXLE. 9 " 48 mins. Cracked in the top section between spring rests.
CRANKCASE. Rear Suspension Arm. Old crankcase used on bump previously.
DUMB IRON. Bolt. 5 " 32 " Head broke off.

Left Margin Text: R.R. 235A (500 T) (S.D. 408. 26-4-17.) Bm. 2/156/13.
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙