Retaining plate for the Wraith II gearbox change gear gate.
| Identifier | ExFiles\Box 8\11\ 11-page048 | |
| Date | 23th November 1936 | |
| BY C. E. {Mr Elliott - Chief Engineer} Da. {Bernard Day - Chassis Design} Rm. {William Robotham - Chief Engineer} RHC {R. H. Coverley - Production Engineer} /HPS. {Horace Percy Smith - Experimental Factory Mgr} 104G 628 E {Mr Elliott - Chief Engineer} /HDY. {William Hardy} 2/HP.23.11.36. Wraith II - Gearbox. We send herewith M.Sch.4960 showing a retaining plate for the four bolts which secure the change gear gate to the frame. When this plate is provided a single hole in the frame as shown by LeC.5353, sheet 3, will be sufficient for assembling. E {Mr Elliott - Chief Engineer} /HDY. {William Hardy} | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
