Rolls-Royce Archives
         « Prev  Box Series  Next »        

Blueprint diagram illustrating Stutz engine valve lift and timing.


Identifier  WestWitteringFiles\R\2December1927-February1928\  Scan083
Date  19th December 1927 guessed
  
STUTZ VALVE LIFT DIAGRAM. EXHAUST CAM LEADS INLET CAM BY 116° (CAMSHAFT). BOTH CAMS ARE THE SAME SHAPE. TAPPET CLEARANCE (RUNNING) = .028". VALVE DURATION WITH ABOVE CLEARANCE IS 230° (ON CRANKSHAFT). TAPPET CLEARANCE TO CHECK TIMING = .032". MAXIMUM VALVE LIFT (AT .028") = .34375". Y-Axis: VALVE LIFT (INS). X-Axis: CRANKSHAFT ANGULAR MOVEMENT. Graph Labels: RUNNING CLEARANCE (.028), Exhaust Valve, Inlet Valve, VALVE OVERLAP. FIG: II. VALVE TIMING. Left Diagram: T.D.C., I.O. 16° P.T.D.C., E.C. 9° P.T.D.C., 54°, 42°, I.C., E.O., B.D.C., .032 TAPPET CLEARANCE. Right Diagram: T.D.C., I.O. 10° P.T.D.C., E.C. 5° P.T.D.C., 57°, 45°, I.C., E.O., B.D.C., .028" TAPPET CLEARANCE. (RUNNING CONDITIONS).
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙