Rolls-Royce Archives
         « Prev  Box Series  Next »        

Cost estimate for a Thermostatic Bypass and Shutter Control Unit on the Phantom III Chassis.


Identifier  ExFiles\Box 94\3\  scan0124
Date  11th December 1936
  
To Rm. {William Robotham - Chief Engineer} from G {Mr Griffiths - Chief Accountant / Mr Gnapp} /Rb. {R. Bowen} 340 G {Mr Griffiths - Chief Accountant / Mr Gnapp} /Rb. {R. Bowen} 5/M/72/W.141236.
c.c. to RHC {R. H. Coverley - Production Engineer} /TVP.
STEADMAN
h {Arthur M. Hanbury - Head Complaints} /Wa {Mr Wallis}
Thermostatic Bypass and Shutter Control Unit on Phantom III Chassis - LEC.5384 -Sec.5250. Rm {William Robotham - Chief Engineer} /SMD {J. Smedley}
Rm {William Robotham - Chief Engineer} /Std.9/AP.11.12.36.
We estimate that if this Thermostatic Bypass Scheme is adopted on Phantom III Chassis, the increase in factory cost will be between £4. and £5. per chassis.
Your drawing returned herewith.
G {Mr Griffiths - Chief Accountant / Mr Gnapp} /Rb. {R. Bowen} [Signature]
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙