Rolls-Royce Archives
         « Prev  Box Series  Next »        

Overheating issue with Chassis No. 3-AX-175, detailing the return of a radiator matrix after failed repairs.


Identifier  ExFiles\Box 96\1\  scan0330
Date  6th July 1938
  
File P-III Radiators

N/W. Rm {William Robotham - Chief Engineer} /Std.
Hd. {Mr Hayward / Mr Huddy}
D {John DeLooze - Company Secretary} /BP.

361

Br {T. E. Bellringer - Repair Manager} /G2/G.6-7-38.

[Illegible signature]

re. Chassis No. 3-AX-175. Normand Garage.
(Tech. P-III Radiator Matrices)

We have returned by your Lorry this morning -

1 - E {Mr Elliott - Chief Engineer} /87239 Mk.VI Matrix - Y/78/F, with top & bottom tanks, ex the above car.

The circumstances are, that we received the car with a complaint of overheating. We attempted to reset the steam valve, to effect a cure, but the pressure would not remain constant. We thereupon, took the steam valve apart, generally checking the same over, and machining the stand pipe, to ensure that the latter was true, subsequently re-assembling and refitting. The pressure still would not hold up.

We next fitted a complete new steam valve & chamber in replacement, without success, as the result was the same. In our opinion, we suspect the trouble to be due to an air leak in the water over-flow pipe in the matrix, and considered it advisable for you to have the latter at Derby for examination.

Will BP please hand it over to Std, and credit our Stock accordingly.

Br {T. E. Bellringer - Repair Manager} /G.
259

[Illegible signature]
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙