Rolls-Royce Archives
         « Prev  Box Series  Next »        

Attaching design progress reports for two separate two-week periods.


Identifier  ExFiles\Box 133\4\  scan0269
Date  16th September 1941
  
1125
To Rm. {William Robotham - Chief Engineer} from Ev {Ivan Evernden - coachwork} /JD. {J. Draper - Frames}
c. to Ev. {Ivan Evernden - coachwork} [Strikethrough]
c. to Rm {William Robotham - Chief Engineer} /FJH. {Fred J. Hardy - Chief Dev. Engineer} [Strikethrough]

Ev {Ivan Evernden - coachwork} /JD. {J. Draper - Frames} 8/JH.16.9.41.

re Progress Report.

We attach herewith the design progress report for the two weeks ending Aug. 4th. 1941, also the two weeks ending Aug. 18th. 1941.

Ev {Ivan Evernden - coachwork} /JD. {J. Draper - Frames}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙