Stating the minimum time required to prepare for production.


Identifier  ExFiles\Box 98\1\  scan0312
Date  21th October 1941
  
- 2 -

The minimum time required to prepare for pro-
duction, dealing with the work as set out above, would be 4½ months.

Rm {William Robotham - Chief Engineer} /EAG.

21.10.41.
  
  