Rolls-Royce Archives
         « Prev  Box Series  Next »        

Overload tests on a Phantom III steering gear and the replacement of a failed roller follower.


Identifier  ExFiles\Box 95\1\  scan0523
Date  18th April 1939
  
350

To HPS. {Horace Percy Smith - Experimental Factory Mgr} from Rm {William Robotham - Chief Engineer} /FJH. {Fred J. Hardy - Chief Dev. Engineer}

Rm {William Robotham - Chief Engineer} /FJH. {Fred J. Hardy - Chief Dev. Engineer} 4/MH. {M. Huckerby} 18.4.39.

PH.III STEERING.

We are carrying out overload tests on a P.III steering gear in the bumper house. This note is to confirm that we have asked you to dismantle the gear and fit a new production roller follower complete with bearing rollers and cages and inner races in place of the one which has failed.

Rm {William Robotham - Chief Engineer} /FJH. {Fred J. Hardy - Chief Dev. Engineer}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙