Request for a one-off stiffened gearbox extension shaft for a Wraith experimental car to eliminate a period.
| Identifier | ExFiles\Box 8\11\ 11-page117 | |
| Date | 22th March 1938 | |
| EY/NS {Norman Scott} c. Rm. {William Robotham - Chief Engineer} 628. DA. {Bernard Day - Chassis Design} 1/G.22.3.38. WRAITH GEAR BOX. Herewith is FD. {Frank Dodd - Bodies} 133 shewing a stiffened gearbox extension shaft, which it is desired to try with a view to eliminating a period. A rough detail of the piece is required, to make one off. It should be made to suit the existing experimental car, to enable it to be tried with the minimum of delay. DA. {Bernard Day - Chassis Design} | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
