Rolls-Royce Archives
         « Prev  Box Series  Next »        

The elimination of baffles from the Wraith III radiator to achieve a time saving.


Identifier  ExFiles\Box 9\3\  03-page120
Date  12th August 1938
  
Rm {William Robotham - Chief Engineer} /Std. from RHC {R. H. Coverley - Production Engineer} /SS. {S. Smith}

RHC {R. H. Coverley - Production Engineer} /SS. {S. Smith} 1/LS.12.8.38.

[Handwritten note: STD Holm Thuyson]

WRAITH III.

RADIATOR - STEAM ESCAPE PIPE.

Referring to Rm {William Robotham - Chief Engineer} /Std.8/MH. {M. Huckerby} 18.7.38, we are agreeable to the EW.1170 Baffles being eliminated from the Radiator commencing on the 25th Chassis in "A" Series; providing we are permitted to modify the slots in the existing water outlet castings EW.1663, in accordance with Rm {William Robotham - Chief Engineer} /Std.6/MH. {M. Huckerby} 18.7.38. [Handwritten note: 6403.]

It is estimated that a saving of 2 hours per Radiator will be made, and in view of this we shall be glad if you will issue the necessary instructions immediately.

RHC {R. H. Coverley - Production Engineer} /S.Smith.
[Signature: RHC {R. H. Coverley - Production Engineer} ]
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙