Revision notice detailing the replacement of a propeller shaft on a Bentley Chassis due to needle bearing failure.


Identifier  ExFiles\Box 153\3\  scan0193
Date  6th January 1943
  
Chassis
To......Rm. {William Robotham - Chief Engineer} from Rm {William Robotham - Chief Engineer} /Wym {G. Harold Whyman - Experimental Manager} /CP.
C.C.......Rm {William Robotham - Chief Engineer} /Wym. {G. Harold Whyman - Experimental Manager}

804

Rm {William Robotham - Chief Engineer} /CP.1.JMA. 6.1.43

Bentley Chassis 1-B-50

Bentley Unit B.60 - No.1.

Specification of the above chassis is revised as follows :-

Work carried out at Clan 4.1.43.

Propellor Shaft.LOP. GB.3176.

GB.3240 Prop.Shaft removed due to failure of needle bearings.

New one fitted GB.3240.

Rm {William Robotham - Chief Engineer} /CP
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙