Rolls-Royce Archives
         « Prev  Box Series  Next »        

The rebuild of a 25.G.VI gearbox with a new main shaft and bearings.


Identifier  ExFiles\Box 8\11\  11-page143
Date  6th December 1938
  
628
To HPS. {Horace Percy Smith - Experimental Factory Mgr} from Rm {William Robotham - Chief Engineer} /FJH. {Fred J. Hardy - Chief Dev. Engineer}
c. Rm {William Robotham - Chief Engineer} /Wym. {G. Harold Whyman - Experimental Manager}

Rm {William Robotham - Chief Engineer} /FJH. {Fred J. Hardy - Chief Dev. Engineer} 1/MH. {M. Huckerby} 6.12.38.

25.G.VI GEARBOX.

The above gearbox is at present removed from the car and in the shop for examination of the 1st. M. {Mr Moon / Mr Moore} shaft. Will you please rebuild with a 1st. M. {Mr Moon / Mr Moore} shaft PD.310 in S/ZNX as now being dyno tested and one of the Ransome & Marles DMJT.40.J bearings in the shop.

Rm {William Robotham - Chief Engineer} /FJH. {Fred J. Hardy - Chief Dev. Engineer}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙