Rolls-Royce Archives
         « Prev  Box Series  Next »        

Equipment estimate for the repair of a bearing on the dynamo test rig in the Electrical Laboratory.


Identifier  ExFiles\Box 143\1\  scan0380
Date  10th November 1939
  
To Millwrights.
C to N Chambers
C to Powers Dept.
C Rm. {William Robotham - Chief Engineer}
EQUIPMENT ESTIMATE. 1209
Requisition No. B 5412
FOR DEPT. / 479
Ref. EJJ/HC.10/WB. {Mr Brazier / Mr Bell} 10.11.39.
R.R. M {Mr Moon / Mr Moore} /C No.
WORKS ORDER No. 815
Req. signed by Mr. Robotham.
Estimated Cost
Labour. £ 3. 5. 0.
Material. £ 1. 4. 6.
Total. £ 4. 9. 6.
Description of Work
Please arrange to repair the bearing on the dynamo test rig in the Electrical Laboratory.
EJJ/HC.
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙