Revised specification for work carried out on Bentley Chassis 2-B-50, specifically detailing the front suspension inspection.
| Identifier | ExFiles\Box 153\3\ scan0169 | |
| Date | 15th April 1942 | |
| Chassis AH To Rm. {William Robotham - Chief Engineer} from Rm {William Robotham - Chief Engineer} /CP. to Rm {William Robotham - Chief Engineer} /Wym. {G. Harold Whyman - Experimental Manager} 1298 Rm {William Robotham - Chief Engineer} /CP.3/LH. {Mr Haworth} 15.4.42. Bentley Chassis 2-B-50. Engine Unit B.V - No.3. revised as follows :- Specification of the above Chassis is Work carried out at Clan prior to Storage at Shardlow 1.4.42. Front Suspension. LOP.FB.4093. FB.4202/3 Triangle Levers - Cast Steel. (existing) dismantled for Inspection and Crack test. N.S. OK. O.S. Crack visible in neck, rear centre anchorage painted red for identification. Both levers refitted. Rm {William Robotham - Chief Engineer} /CP. | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
