Rolls-Royce Archives
         « Prev  Box Series  Next »        

Confirming the electrical requirements for a new petrol pump rig in the Garage Wash.


Identifier  ExFiles\Box 143\1\  scan0238
Date  19th February 1937
  
1209 .

EJJ/JV. from Rm {William Robotham - Chief Engineer} /Gry. {Shadwell Grylls}

Rm {William Robotham - Chief Engineer} /Gry {Shadwell Grylls} 3/R.19.2.37.

Confirming our conversation, we want to be able to run an extensive petrol pump rig in the Garage Wash, and for this purpose we want a D.C. supply brought down to a board equipped with suitable resistance to give 12 volts at about 4 amperes. We shall run an ordinary car battery permanently in parallel with the petrol pumps.

Rm {William Robotham - Chief Engineer} /Gry. {Shadwell Grylls}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙