Rolls-Royce Archives
         « Prev  Box Series  Next »        

Production status report detailing the manufacturing progress of various components.


Identifier  ExFiles\Box 97\1\  scan0084
Date  28th October 1937
  
- 10 -

Front Brakes.
6 Sets instructed completing 3 sets.
FB.3113/4 Brake Shoes
FB.3115/6 Carrier Plates
A {Mr Adams} /C Castings.
Pressings C.O.
Further details onyl received 28.10.37.
Handwritten: UNALTERED

Front Hubs.
6 Sets instructed and completed.
CB.2828 Brake Drums
R.R.53 C.Castings - fitted with Millenite Liners.
Handwritten: UNALTERED

Crankcase & Brgs.
1 Top Half Crankcase as Wraith III in operation. Awaiting D.O. instructions as to what LOP. we are to work to.
Bearing Caps as Wraith III in op.
Handwritten: CHECK INSTRUCTIONS ON BOTTOM HALF

Crankshaft
6 Sets instructed proceeding with 4 sets with Wraith III.
EW.1370 Crankshaft
50% machined.
Handwritten: NEW BALANCE WTS.

Spring Drive
6 Sets instructed proceeding with 4 sets as Wraith III. 50% machined.
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙