Rolls-Royce Archives
         « Prev  Box Series  Next »        

Postponing the testing of condensers from the Dubilier Condenser Company until their representative can visit.


Identifier  ExFiles\Box 34\1\  Scan211
Date  10th February 1921
  
X 2512

To By. {R.W. Bailey - Chief Engineer} from EFC. {E. Fowler Clarke - Electrical Engineer}
c. to Mr. Brock.
c. to Mr. Wallace (O.O.)

EFC {E. Fowler Clarke - Electrical Engineer} 1/T10.2.21.

X.2512 - CONDENSERS.

We understand we yesterday received a further
batch of condensers from the Dubilier Condenser Company.
It is suggested that the testing of these be postponed until
their Mr. Goodman is able to visit us. With this end in
view, Mr. Wallace is writing and arranging for the visit of
Mr. Goodman and when he comes, we will demonstrate to him
that the voltage which we use for test is switched on at
about 225, raised to 400 and maintained for about 10 minutes.

He will then be able to see that our test is
not abnormal and will be satisfied on the point referred to
in his letter asking for a voltmeter to be put in the circuit.

EFC. {E. Fowler Clarke - Electrical Engineer}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙