Work order detailing running times, tests to be done, and required spares for a Chassis S/C Unit.
| Identifier | ExFiles\Box 134\1\ scan0016 | |
| Date | 18th August 1937 | |
| To HPS. {Horace Percy Smith - Experimental Factory Mgr} from Rm {William Robotham - Chief Engineer} /Ed. {J. L. Edwards} c. Rm {William Robotham - Chief Engineer} /Swdl. {Len H. Swindell} Rm {William Robotham - Chief Engineer} /ED. {J. L. Edwards} 2/AP.18.8.37 CHASSIS S/C. UNIT. Running time for week ending Sat. 14th. Aug.1937 = 11¾ hrs. Fitting " " " " " " " = 22¼ " Work to be done. Time. Power detonation and back pressure tests on inclined valve head with I/C. block. Compression pressure tests. 7 days. SPARES. (1) Re-condition T.H. (2) Two sets of valve gear details. (3) Two sets of bottom tappets (Urgent) Rm {William Robotham - Chief Engineer} /Ed. {J. L. Edwards} | ||