Rolls-Royce Archives
         « Prev  Box Series  Next »        

List of modifications and parts not yet fitted to the 25/30 HP and Phantom III production chassis.


Identifier  ExFiles\Box 154a\3\  scan0246
Date  2nd December 1936
  
1310
Rm. {William Robotham - Chief Engineer}
Mx. {John H Maddocks - Chief Proving Officer}
Hd. {Mr Hayward / Mr Huddy}
D {John DeLooze - Company Secretary} /BP
BY {R.W. Bailey - Chief Engineer} /NW {N. Walker - Patents}

BY {R.W. Bailey - Chief Engineer} /Mtn4/N.2.12.36.

Re: 25/30 HP. & Phantom III - Parts not yet fitted to Production Chassis.

------------------------------------------------------------------------

25/30 HP. Chassis.
Date Issued. Stn.Sht. No. Title. Date completed. Series where brought in. Chassis to test.

11.5.36 X.6134 Modified geared starter motor bush. 29.6.36 'O' 4.1.37.

23.9.36 X.540 Water connection-engine to radiator using rubber hose and clips without 'C' nuts or metal pipe. 2.10.36 'O' 4.1.37.

2.10.36 X.551 Superflexit petrol piping. 12.11.36 When available.

Phantom III Chassis.
---------------------

7.9.36 X.306 Brake drums in R.R. cylinder iron. 15.9.36 101 in 'B' 3.1.37


(The above dates given for the introduction of the modifications are programme dates).

------------------------------------------------------------------------

BY {R.W. Bailey - Chief Engineer} /Mtn.
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙