Suggestions concerning the construction of the pan of the front suspension for the Wraith III.
| Identifier | ExFiles\Box 9\5\ 05-page077 | |
| Date | 1st June 1937 | |
| SECRET. Copy to Mr. [REDACTED] Rm. {William Robotham - Chief Engineer} [REDACTED] Hucr. [REDACTED] 646 LES Any Comments RDn S/Ev. {Ivan Evernden - coachwork} S/M.1.6.37. WRAITH III. FRONT SUSPENSION. ------------------------- The Experimental Dept. have made the following suggestions concerning the construction of the pan of the front suspension:- (1) It is desired to delete the present surface plates FW.339 between the forgings of the lower triangle bearings for the front suspension and the pan. The thickness of the surface plate would added to the forging. (2) It is desired to replace the .250 diameter rivets which secure the stiffener FW.1081 by electric spot welding. We agree to both of the above modifications. E {Mr Elliott - Chief Engineer} /Ev. {Ivan Evernden - coachwork} | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
