Rolls-Royce Archives
         « Prev  Box Series  Next »        

Dates of first fitting for standard batteries to 40/50 and 20 HP chassis.


Identifier  ExFiles\Box 54\2\  Scan074
Date  26th November 1925
  
x4617

To NRC. {N. R. Chandler} from EFC. {E. Fowler Clarke - Electrical Engineer}
EFC {E. Fowler Clarke - Electrical Engineer} 5/T26.11.25.

x4617
x4642

RE DATES OF FIRST FITTING PRESENT STANDARD BATTERIES TO CHASSIS.

The dates which I have obtained from the Order Office at which commence the supplying of the present standard batteries for 40/50 and 20 HP. chassis respectively, are as follows :-

40/50.
Exide 6RR5. 18.2.24.
P & R RR.11. 12.5.24.

20 HP.
Exide 6XL3/4. 15.7.24.
P & R TBD.7. 23.9.22.

I shall be pleased to have from you any information of premature failures of any of these batteries. Perhaps I should remark that the P & R TBD.7's, though the same internally, have had a change of the cell to cell connecting links which are exposed on the top of the battery, e.g. they changed from thin lead-covered copper, to thick all lead links; but the other batteries are the same to-day as when first issued for chassis.

EFC. {E. Fowler Clarke - Electrical Engineer}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙