Rolls-Royce Archives
         « Prev  Box Series  Next »        

Standardisation of a modified rear spare wheel carrier and luggage grid to increase ground clearance.


Identifier  ExFiles\Box 114\4\  scan0190
Date  26th March 1929
  
RR 755 REVISED (10H) (D.C. 777-29-2-28) MC C. LTD
45400 COMPLETED 9.5.29
STANDARDISATION of CHASSIS PARTS.
Date 26.3.29
Description of Parts. REAR SPARE WHEEL CARRIER AND LUGGAGE GRID, LOP. E1697
X No. 5400 5600
Drawing No.
Part List
Origin. To increase ground clearance.
Experimental Test Report. The design differs little from that on 14-G4 which has done 10,000 miles.
Road Test Report. Will have done 10,000 miles on 17-G4 before cars leave test.
A Scrap and replace at all costs, including Chassis already delivered to Customers.
B Scrap and replace on Chassis in Works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.
[Faint stamp across document: CHASSIS DEPT]
Weight of Old Part.
Cost of Old Part. £ 4. 17. 3
Weight of New Part.
Cost of New Part. £ 7. 0. 6
Difference per Car.
Difference per Car. £ 2. 3. 3.
Cost of Parts in Works which will be scrapped if commenced on :-
Series.........£.........
Series.........£.........
Series.........£.........
[Stamped text in cost section] If rear spare wheel carrier only is fitted the increased cost per chassis is £1. 4. 0
Signature from Cost Dept. that above is correct. G {Mr Griffiths - Chief Accountant / Mr Gnapp} /Rb. {R. Bowen} 30.4.29 Wor. {Arthur Wormald - General Works Manager}
[Approval Table]
INITIAL | DATE | REMARKS | Sg. {Arthur F. Sidgreaves - MD}
ED. {J. L. Edwards} SG. {Arthur F. Sidgreaves - MD} | 9.5.29 | Agreed. | Sg. {Arthur F. Sidgreaves - MD}
R. {Sir Henry Royce} | 22.4.29 | Agreed. | FHR.
WOR. {Arthur Wormald - General Works Manager} | 26.3.29 | Agreed. | Wor. {Arthur Wormald - General Works Manager}
RG. {Mr Rowledge} | 3.4.29 | Agreed. | RG. {Mr Rowledge}
DA. {Bernard Day - Chassis Design} | 4.4.29 | Agreed. | DA. {Bernard Day - Chassis Design}
BY. {R.W. Bailey - Chief Engineer} | 26.3.29 | Agreed. | BY. {R.W. Bailey - Chief Engineer}
EP. {G. Eric Platford - Chief Quality Engineer} | 27.3.29 | Agreed. | EP. {G. Eric Platford - Chief Quality Engineer}
E. {Mr Elliott - Chief Engineer} | 10.4.29 | Agreed. | E. {Mr Elliott - Chief Engineer}
PN. {Mr Northey} | 11.4.29 | Agreed. | PN. {Mr Northey}
CWB. | 27.3.29 | Agreed. | CWB.
HS. {Lord Ernest Hives - Chair} | 26.3.29 | Agreed. | Hs. {Lord Ernest Hives - Chair} Rn. {Mr Robinson}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙