Rolls-Royce Archives
         « Prev  Box Series  Next »        

Standardisation of chassis parts concerning the adoption of drilled HP shock absorber valves and lubrication of Phantom I springs.


Identifier  ExFiles\Box 68\2\  scan0256
Date  20th November 1929
  
RR 755 REVISED (10H) (DF 687 4-1-29) BM. 2/5943.
X8520. COMPLETED 20.3.30.
STANDARDISATION of CHASSIS PARTS.
Date 20.11.29
X No. 8410 (Handwritten above: X8520)

Description of Parts. Adoption of drilled H.P. shock absorber valves and Lubrication of Phantom I springs with grooves.

Origin. [Handwritten: S/Ph] To overcome complaints of harsh riding.

Experimental Test Report. We find that we can make a big improvement by this combination.

Road Test Report. It has been tried on a number of cars with good results.

[Stamp: Received 20 MAR 1930]

Memo attached.

A Scrap and replace at all costs, including Chassis already delivered to Customers.
B Scrap and replace on Chassis in Works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.

Weight of Old Part. Cost of Old Part.
Weight of New Part. Cost of New Part.
Difference per Car. Difference per Car.
[Handwritten in cost section: See memo attached. Agreed W.H. 18.3.30]

Signature from Cost Dept. that above is correct. [Handwritten Signature: G {Mr Griffiths - Chief Accountant / Mr Gnapp} /R] [Date: 17/3/30] G. {Mr Griffiths - Chief Accountant / Mr Gnapp}

Cost of Parts in Works which will be scrapped if commenced on :-
Series.........£.......
Series.........£.......
Series.........£.......

TABLE OF INITIALS, DATES, AND REMARKS:
INITIAL | DATE | REMARKS
BJX Sg. {Arthur F. Sidgreaves - MD} | 20-3-30 | Agreed Sg {Arthur F. Sidgreaves - MD}
R. {Sir Henry Royce} | 23.11.29 | Strongly in favour of properly lubricated springs. THR.
WOR. {Arthur Wormald - General Works Manager} | 25.11.29 | Agreed Wor. {Arthur Wormald - General Works Manager}
RG. {Mr Rowledge} | 22.11.29 | Agreed Rg. {Mr Rowledge}
DA. {Bernard Day - Chassis Design} | 22.11.29 | Agreed Da. {Bernard Day - Chassis Design}
BY. {R.W. Bailey - Chief Engineer} | 21.11.29 | Agreed By. {R.W. Bailey - Chief Engineer}
EP. {G. Eric Platford - Chief Quality Engineer} | 20.11.29 | Agreed in case complaint or obviously bad. Consider P.II has similar tendency, as discussed Rm. {William Robotham - Chief Engineer} EP. {G. Eric Platford - Chief Quality Engineer}
E. {Mr Elliott - Chief Engineer} | 23.11.29 | Agreed AE.
PN. {Mr Northey} | 21.11.29 | Agreed PN. {Mr Northey}
CWB. | 21.11.29 | Agreed C.
HS. {Lord Ernest Hives - Chair} | 20.11.29 | Agreed.
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙