Requesting the construction of a Phantom III propeller shaft to investigate inconsistent balance issues after fitting transmission dampers.


Identifier  ExFiles\Box 94\4\  scan0148
Date  7th April 1937
  
337.

HPS. {Horace Percy Smith - Experimental Factory Mgr} from Rm {William Robotham - Chief Engineer} /Smth. Rm {William Robotham - Chief Engineer} /Smth3/R.7.4.37.

P.III PROPELLER SHAFT.

We have recently fitted transmission dampers to
one or two P.III's, and have been troubled by the propeller
shaft balance being inconsistent. As we have issued a Depot
Sheet for fitting the damper in the case of drive groan
complaints, we want to investigate the out-of-balance quickly.

Will you please have built up a P.III propeller
shaft, complete with a 25/30 damper, in which each of the
following items are in independent balance:-

(1) Shaft.
(2) Damper hub.
(3) Inertia rings.

We shall then see if the balance can be upset by
turning the rings into different positions.

Rm {William Robotham - Chief Engineer} /Smth.
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙