Rolls-Royce Archives
         « Prev  Box Series  Next »        

Standardisation proposal for the water connections between the engine and radiator on the 25/30 HP Bentley chassis.


Identifier  ExFiles\Box 87\1\  scan0230
Date  10th May 1937
  
RR 755B (10H) 26074 2-11-36 WHK 24999
COMPLETED 1.6.37.
BENTLEY STANDARDISATION of PARTS.
Date: 10.5.37
No. 240
Drawing No. Parts to be detailed as 25/30 H.P.
Description of Parts: WATER CONNECTIONS (1) Connection from engine to radiator as 25/30 chassis - one hose and two clips, dispenses with Tee Nut union. (2) Rubber hose connections (both top and bottom) to be as supplied by Leyland & Birmingham Rubber Co. Ltd to Specification 1633K.
Origin: (1) To save cost. (2) To avoid swelling, disintegration and general deterioration of this hose over long period of service, particularly if in contact with oil or grease.
Report of Experimental Test: (1) Similar scheme now std. on 25/30 cars. (2) Similar hose run 20,000 miles satisfactorily on 35-EX car and will shortly have completed 10,000 miles on 6-B-IV and 3-B-IV cars in France.
MATERIAL
£ s. d. {John DeLooze - Company Secretary}
Cost of Old Part: 2 6
Cost of New Part: 1 11
Nett Decrease: 2 2
LABOUR
£ s. d. {John DeLooze - Company Secretary}
2 1
1 6
CHARGES
£ s. d. {John DeLooze - Company Secretary}
3 8
2 8
TOTAL
£ s. d. {John DeLooze - Company Secretary}
8 3
6 1
Signature from Cost Dept. that above is correct. G {Mr Griffiths - Chief Accountant / Mr Gnapp} /Rh {R. Hollingworth} 7.5.37.
INITIAL
DATE
REMARKS
SG. {Arthur F. Sidgreaves - MD}
31-5-37.
Agreed Sg {Arthur F. Sidgreaves - MD}
HS. {Lord Ernest Hives - Chair}
Agreed Hs. {Lord Ernest Hives - Chair}
C.
13.5.37.
Agreed C.
E. {Mr Elliott - Chief Engineer}
13.5.37.
Agreed E. {Mr Elliott - Chief Engineer}
DA. {Bernard Day - Chassis Design}
19.5.37.
Agreed Da. {Bernard Day - Chassis Design}
BY. {R.W. Bailey - Chief Engineer}
13.5.37.
Agreed By. {R.W. Bailey - Chief Engineer}
EP. {G. Eric Platford - Chief Quality Engineer}
13.5.37.
Agreed EP. {G. Eric Platford - Chief Quality Engineer}
SFT. {Mr Swift} RHC. {R. H. Coverley - Production Engineer}
13.5.37.
Agreed RHC. {R. H. Coverley - Production Engineer}
MX. {John H Maddocks - Chief Proving Officer}
25.5.37.
Agreed Mx. {John H Maddocks - Chief Proving Officer}
RM. {William Robotham - Chief Engineer}
11.5.37.
Agreed Rm. {William Robotham - Chief Engineer}
Stamp: J.S. MAY 28 1937
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙