Rolls-Royce Archives
         « Prev  Box Series  Next »        

Standardisation of a piston with 5 narrow rings to replace the existing 3 narrow and 1 wide ring design.


Identifier  ExFiles\Box 105\2\  scan0163
Date  6th April 1927
  
RR 782 REVISED (10H) (DE 649 9-12-26) BM. 2/1187.
Handwritten Top: x5040, Complete/ck {Mr Clark} 25.8.27, 57

STANDARDISATION of CHASSIS PARTS.

Date 6.4.27

Description of Parts. PISTON WITH 5 NARROW RINGS - INSTEAD OF 3 NARROW AND ONE WIDE AS AT PRESENT.

Origin. To improve design.

Experimental Test Report.
The present standard piston on 20 HP. has 3 rings .100" wide and one .187" wide. The proposal is to fit 5 rings .100" wide - this can be done without altering pin position of the top ring.
See drg. E.53955.

Road Test Report.
Fitted to 9-G-111 - run 8800 miles.
Fitted to 11-G-111 - run 3700 miles.
These are an improvement as regards gas tightness and reduce the tendency for rings to squeak.

[Right Side Box]
X No. 5040
Drawing No.
Part List
A Scrap and replace at all costs, including Chassis already delivered to Customers.
B Scrap and replace on Chassis in Works.
C [Ticked] Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.

[Cost Section]
Weight of Old Part.
Cost of Old Part. £ 2. 4. 6d.
Weight of New Part.
Cost of New Part. £ 2. 10. 1d.
Difference per Car.
Difference per Car. £ 5. 7d. increase.
Signature from Cost Dept. that above is correct. My/Rb. {R. Bowen} 12.4.27.

[Cost of Parts Box]
Cost of Parts in Works which will be scrapped if commenced on:-
Series.........£.......
Series.........£.......
Series.........£.......

[Approval Table]
INITIAL | DATE | REMARKS
BJ. | 25.5.27 | agreed
R. {Sir Henry Royce} | 11.4.27 | Agreed. FHR.
WOR. {Arthur Wormald - General Works Manager} | 6.4.27 | Agreed. Wor. {Arthur Wormald - General Works Manager}
RG. {Mr Rowledge} | 13.4.27 | Agreed. RG. {Mr Rowledge}
DA. {Bernard Day - Chassis Design} | 8.4.27 | Agreed. Da. {Bernard Day - Chassis Design}
BY. {R.W. Bailey - Chief Engineer} | 7.4.27 | Agreed. BY. {R.W. Bailey - Chief Engineer}
EP. {G. Eric Platford - Chief Quality Engineer} | 7.4.27 | Agreed. EP. {G. Eric Platford - Chief Quality Engineer}
E. {Mr Elliott - Chief Engineer} | 11.4.27 | Agreed. E. {Mr Elliott - Chief Engineer}
PN. {Mr Northey} | |
CWB. | 5.5.27 | Agreed. CWB.
Hs. {Lord Ernest Hives - Chair} | 6.4.27 | Agreed. Hs. {Lord Ernest Hives - Chair}
Handwritten signature across RG {Mr Rowledge} , DA {Bernard Day - Chassis Design} , BY, EP {G. Eric Platford - Chief Quality Engineer} , E rows: Instructed

[Large green stamp overlaid on document: 20 H.P. CHASSIS]
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙