The delay in receiving a modified exhaust system for a 20/25HP Chassis 21-G-IV.


Identifier  ExFiles\Box 101\4\  scan0139
Date  2nd December 1935
  
To Rm. {William Robotham - Chief Engineer} from RHC {R. H. Coverley - Production Engineer} /WSC {W. S. Cassel}

x500a
Rm {William Robotham - Chief Engineer} [crossed out]

RHC {R. H. Coverley - Production Engineer} /WSC. {W. S. Cassel} 8/EP. {G. Eric Platford - Chief Quality Engineer} 2.12.35.
Wyman

20/25HP Chassis 21-G-IV

The above car has been in the shop for some considerable time and we are still waiting in accordance with Hs {Lord Ernest Hives - Chair} /Rm. {William Robotham - Chief Engineer} 27/KW.5.11.35 for the modified exhaust system as called for on the above mentioned memo i.e. Modification to suit large bore engine, which was promised to be instructed by Hs {Lord Ernest Hives - Chair} /Wym. {G. Harold Whyman - Experimental Manager}

RHC {R. H. Coverley - Production Engineer} /WSC. {W. S. Cassel}

[Signature]

Instructed
4-12-35.

[Signature]
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙