The arrangement drawing of the 'Myth' chassis and a list of sections to be corrected.
| Identifier | ExFiles\Box 109\2\ scan0144 | |
| Date | 11th February 1941 | |
| To Rm. {William Robotham - Chief Engineer} from Ev {Ivan Evernden - coachwork} /JD. {J. Draper - Frames} c. to Ev. {Ivan Evernden - coachwork} c. to Rm {William Robotham - Chief Engineer} /HH. c. to Rm {William Robotham - Chief Engineer} /EAG. 704 Ev {Ivan Evernden - coachwork} /JD. {J. Draper - Frames} 6/SW.11.2.41. MYTH. CHASSIS. We attach to Rm {William Robotham - Chief Engineer} /HH's copy the original of :- PL.443 Arrangement of Myth Chassis. The above drawing has been produced at Rm {William Robotham - Chief Engineer} 's request and represents what the final Myth chassis will be like. The following sections will be corrected when the final designs are completed :- (1) Front Cross member. (2) Hand Brake Lever. (3) Side Lever Mechanism. (4) Steering column & Head. (5) Exhaust System. Ev {Ivan Evernden - coachwork} /JD. {J. Draper - Frames} Original to Rm {William Robotham - Chief Engineer} /HH. Prints to Ev. {Ivan Evernden - coachwork} Rm {William Robotham - Chief Engineer} /HH. Ev {Ivan Evernden - coachwork} /JD. {J. Draper - Frames} Rm {William Robotham - Chief Engineer} /EAG & Ashby. | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
