From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Alteration to the gearbox to adopt a modified change gear mechanism for the 40/50 HP Chassis.
Identifier | ExFiles\Box 171\1\ img061 | |
Date | 1st October 1926 | |
RR 288A (10M) (SL 72 18-7-23) MP 274954A ORIGINAL. COMPLETED 27.10.26 ALTERATIONS TO R.R. AERO ENGINE PARTS (AERO ENGINE PARTS is struck through) 40/50 HP. CHASSIS. DATE 1.10.26 X No. 7310 7320 Drawing No. G.74171 / G.74700/1 Part List L.O.P. G.7 4167 Air Ministry consent obtained (Struck through) Difference in weight. Description of Parts: GEARBOX TO SUIT PLUNGER CONTROLLED SELECTORS TORSIONALLY FREE 1st. AND 2nd. PINIONS & SLIDING WHEELS RE-ARRANGED TO GIVE DEFINITE END CLEARANCE. Origin: To adopt modified change gear mechanism. Experimental Test Report: The box and gears were quite satisfactory: there was no tendency of any gears coming out of mesh during the 10,000 miles test in France fitted to 12-EX car. "A"-Scrap and replace at all costs. "B"-Scrap and replace on those engines in Works. "C"-Scrap present stock and replace on all engines not yet handed to test. "D"-Use up existing stock. Alteration effective on future engines. Signature of Expl. Dept. that above is correct Weight of Old Part Cost of Old Part £52. 13. 0d. Cost of Parts in Works and Stores which will be scrapped if commenced on:-- Weight of New Part Cost of New Part £53. 7. 0d. Difference per Engine Difference per Engine £ 14. 0 increase. Signature of Mr. De LOOZE that above is correct My/Rb.{R. Bowen} SIGNATURES | DATE | REMARKS [Struck through signature] C.W.B. | 2.10.26 | Agreed. CWB. MR. B. JOHNSON | 27.10.26 | Agreed. B.Johnson. MR. ROYCE | 5/10/26 | Agreed FHR MR. WORMALD | 5.10.26 | Agreed. Wor.{Arthur Wormald - General Works Manager} MR. ROWLEDGE | 5.10.26 | Agreed. Rg.{Mr Rowledge} MR. DAY | 6/10/26 | Agreed JA MR. BAILEY | 11.10.26 | Agreed. BY.{R.W. Bailey - Chief Engineer} MR. PLATFORD | 4.10.26 | Agreed. EP.{G. Eric Platford - Chief Quality Engineer} MR. ELLIOTT | 4/10/26 | Agreed AE MR. HIVES | 1.10.26 | Agreed. Ha. Mr. Northey. | 25.10.26 | Agreed. PN.{Mr Northey} [The document is stamped with the word 'PHANTOM' in large green letters] | ||