Rolls-Royce Archives
         « Prev  Box Series  Next »        

Material delays pending the issue of standardisation sheets for specific parts.


Identifier  ExFiles\Box 19\4\  Scan116
Date  8th July 1930
  
- 2 -

BY {R.W. Bailey - Chief Engineer} /Cgh {W Clough} 3/G.8.7.30.

We should be glad if you would issue standard-
isation sheets covering these items as soon as possible.

Material is still being held up for the
following :-

A {Mr Adams} /- Radiator, Bonnet and Dash. Pending decision in
regard to modified shape.

B/- Thermostatically operated shutters.



BY {R.W. Bailey - Chief Engineer} /Cgh. {W Clough}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙