From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Progress report detailing timelines for various automotive component modifications.

Identifier  ExFiles\Box 30\2\  Scan068
Date  21th September 1932
  
(2)
E.5/HP.21.9.32.

affect Peregrines 2 and 3, and will
be adequately in time for the
subsequent chassis to be fitted up.

(10) Brakes.
Details for direct application of the
braking on all four wheels to be
completed by the 30th.inst.

(11) Central Lubrication.
We expect to complete the details
in connection with the modified scheme
for substituting Luvax fittings in
place of the present banjos with
sweated joints, by October 20th.

(12) Brake and Gear Levers.
Details for stiffer side levers will
be issued by October 1st.

(13) Dynamo.
The scheme for bringing in the CAV.
vibrator control se-with all the
modifications are involved will
require some weeks of scheming,
but it is expected that the instruct-
ions could be completed by November
6th.

(14) Carburetter Starter Control.
Details for Lec.3209 will be issued
on the 28th inst.

(15) Oil Sump.
We expect to issue details for an
improved drainage scheme by about
October 12th.

E.{Mr Elliott - Chief Engineer}
  
  