Chassis progress report for the two weeks ending January 26th, 1942.
Identifier | ExFiles\Box 133\4\ scan0285 | |
Date | 26th January 1942 | |
To Rm.{William Robotham - Chief Engineer} c.c. to Ev.{Ivan Evernden - coachwork} c.c. to Rm{William Robotham - Chief Engineer}/FJH.{Fred J. Hardy - Chief Dev. Engineer} 1125 Ev{Ivan Evernden - coachwork}/JD.{J. Draper - Frames}5/KC.26.1.42. Chassis Progress Report. For the two weeks ending Jan.26th. 1942. Work completed. PL.1181 Investigation of Cane Drag on 2nd, 3rd, & 4th speeds. B.5. Work in hand. PL.669 Exhaust system (1/4 scale layout) Myth 90% PL.686 D.W.S. Hydraulic-jack and lifting tube Myth 80% - Alum. connecting rod - alum engine. S.R. In hand. - Front drive for speedo and tecalemit pump. (Morris G/Box). Myth. In hand. - Painting of instrument board with R.R. instruments. Myth. In hand. PL.828 Front roll rod and revised steering layout - Austin 8. Austin 8. In Hand. PL.829 Spare wheel lock under bootofloor 15.B.V. In hand. PL.904 Rear bumper and fixing Myth. In hand. Four door close coupled saloon. 15.B.V. In hand. ------ Ev{Ivan Evernden - coachwork}/JD.{J. Draper - Frames} | ||