From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation of a 20 HP steering wheel, including costs, tests, and approval.

Identifier  ExFiles\Box 172\1\  img140
Date  4th April 1929
  
RR.788 REVISED (10M) (D.C.777-20-2-28) MC C.L.TP
COMPLETED 13.5.29
STANDARDISATION of CHASSIS PARTS.
Date 4.4.29

Description of Parts. 20 HP. STEERING WHEEL.
Origin. Request from Sales.

Experimental Test Report.
This wheel is 17¾" outside diameter with a thinner section rim. It has been agreed to by Sales.

Road Test Report.
We shall have run these wheels a long way on experimental cars before they come on production.

[X] No. 5430
Drawing No.
Part List

[ ] A Scrap and replace at all costs, including Chassis already delivered to Customers.
[ ] B Scrap and replace on Chassis in Works.
[ ] C Scrap present stock and replace on all Chassis not yet handed to test.
[ ] D Use existing stock Alteration effective on future Chassis.

Weight of Old Part.
Cost of Old Part. £1. 12. 9

Weight of New Part.
Cost of New Part. £1. 5. 0

Difference per Car.
Difference per Car. £ 7. 9d. decrease.

Signature from Cost Dept. that above is correct. G/Rb.{R. Bowen} 9.5.29. G.{Mr Griffiths - Chief Accountant / Mr Gnapp}

Cost of Parts in Works which will be scrapped if commenced on :-
Series..........£..........
Series..........£..........
Series..........£..........

INITIAL | DATE | REMARKS
BJ. SG.{Arthur F. Sidgreaves - MD} | 13.5.29 | Agreed. Sg.{Arthur F. Sidgreaves - MD}
R.{Sir Henry Royce} | | Agreed but are we quite sure it is not too large for the room. R.H. elbow on these cars of smaller width than the 40/50 - also the lower controls should be fitted without delay
WOR.{Arthur Wormald - General Works Manager} | |
RG.{Mr Rowledge} | |
DA.{Bernard Day - Chassis Design} | 9.4.29 | Agreed. DA.{Bernard Day - Chassis Design}
BY.{R.W. Bailey - Chief Engineer} | 7.4.29 | Agreed. BY.{R.W. Bailey - Chief Engineer}
EP.{G. Eric Platford - Chief Quality Engineer} | 6.4.29 | Should like to try one - please say when I can do this - EP.{G. Eric Platford - Chief Quality Engineer}
E.{Mr Elliott - Chief Engineer} | 10.4.29 | Agreed. E.{Mr Elliott - Chief Engineer}
PN.{Mr Northey} | 5.4.29 | Agreed. PN.{Mr Northey}
CWB. | |
Hs.{Lord Ernest Hives - Chair} | 4.4.29 | Agreed. Hs.{Lord Ernest Hives - Chair}