From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Specification revision for Bentley Chassis 9-B-V, detailing changes to the spring suspension.
Identifier | ExFiles\Box 153\3\ scan0161 | |
Date | 5th March 1942 | |
Chassis To Rm.{William Robotham - Chief Engineer} from Rm{William Robotham - Chief Engineer}/CP. 1298 c. to Rm{William Robotham - Chief Engineer}/Wym.{G. Harold Whyman - Experimental Manager} Rm{William Robotham - Chief Engineer}/CP.6/LH.{Mr Haworth}5.3.42. Bentley Chassis 9-B-V.{VIENNA} Bentley 60. Unit No.3. Specification of the above Chassis is revised as follows :- Work carried out at Clan 4.3.42. Previous Specification. Revised Specification. Spring Suspension. Spring Suspension. LOP. FB.3548. LOP's. FB.3548 - FB.4092. 1-FB.3507 Triangle Lever The following new parts fitted to (Cast Steel) Near-side :- 1-FB.2980 Torque Arm (Cast Steel) 1 - FB.4452 Torque Arm 1 - FB.4454 Triangle Lever. removed. 1 - J.389 Roller Bearing. 1 - FB.3143 Silentbloc Bush. 2 - E.2130 " " " Near-side stub axle dismantled and Crack tested by HPS.{Horace Percy Smith - Experimental Factory Mgr} - refitted. Lower Triangle Lever O.S.. Crack tested by HPS.{Horace Percy Smith - Experimental Factory Mgr} - refitted. Rm{William Robotham - Chief Engineer}/CP. | ||