Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Test report logging component failures on a 40/50 front bumper chassis over a 94-hour period.

Identifier  ExFiles\Box 119\2\  scan0164
Date  10th December 1920
  
40/50 CHASSIS.
BUMPER CHASSIS - FRONT.

Special fittings fitted.
Radiator - Monel metal plates and copper tubes.
Rocker shaft on Steering F.8956 - D.{John DeLooze - Company Secretary} type. (X.3920)
Support bracket E.20246 (X.4373)
New Frame with fittings off previous frame.

Total hrs. run. | Remarks.
5 hrs. 30 mins. | Bottom leaf O.S. spring broken.
6 hrs. 40 mins. | 2nd. leaf from bottom O.S. broken.
7 hrs. 0 mins. | 3rd. and 4th. leaves from bottom O.S. broken.
15 hrs. 35 mins. | 5, 6 and 8 leaves N.S. spring broken.
22 hrs. 45 mins. | Top leaf N.S. spring broken - 4th. leaf broken.
33 hrs. 15 mins. | 1, 3, 4, 5, 6, 7 N.S. leaves broken.
56 hrs. 35 mins. | Top leaf N.S. spring broken centre.
59 hrs. 15 mins. | 2nd. and 3rd. leaves N.S. spring broken.
63 hrs. 35 mins. | 7, 8 and 9 leaves N.S. spring broken.
70 hrs. 10 mins. | Centre bolt broken N.S. spring.
81 hrs. 21 mins. | Centre bolt broken N.S. spring.
89 hrs. 56 mins. | Top leaf O.S. spring broken (U.S.A.)
91 hrs. 11 mins. | 6, 7 and 8 leaves broken - 9th. cracked O.S. spring.
Frame cracked at N.S. front cross member bolt holes.
94 hrs. 36 mins. | 2, 12 and 13 leaves broken O.S. spring.

Test finished
Radiator brackets O.K.
Radiator fouls brackets where cleared away at bottom for brackets.

R.R. 335A (100) TY (S.H.) 79S. 10-12-20 G.{Mr Griffiths - Chief Accountant / Mr Gnapp} 2847
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙