Transferring the testing of push button and main switches from the Experimental to the Electrical Production Department.


Identifier  ExFiles\Box 34\3\  Scan042
Date  4th September 1919
  
SFT. {Mr Swift} from BY. {R.W. Bailey - Chief Engineer}
c. to Ormerod.
c. to EFC. {E. Fowler Clarke - Electrical Engineer}

X. 2641.

BY3/P4.9.19.

X.2641. X.3034. RE PUSH BUTTON SWITCH & MAIN SWITCH TESTING.

Mr. Clarke informs me that he considers the above parts could be dealt with to greater davantage in the Electrical Production Department now than they can in the Experimental Dept.

I understand that Mr. Watson is quite capable of carrying out the tests in question, and there should be no difficulty in putting this idea into exe(Aero Engine)cution at once.

I would like Mr. Ormerod to discuss the question personally with Mr. Watson as it appears to me that Mr. Clarke's ideas on the subject are quite in order. If, however, there appears to be any hitch in regard to apparatus or any other points, I wish to have this mat-ter discussed between Mr. Ormerod, Mr. Watson and myself, without delay.

It is proposed that Mr. Watson should take over the testing commencing from next Monday, the 8th Inst.

BY. {R.W. Bailey - Chief Engineer}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙