From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation report for an oil relief valve designed to improve reliability.
Identifier | ExFiles\Box 171\1\ img057 | |
Date | 22th September 1926 | |
RR 755 (10M) (DB{Donald Bastow - Suspensions}120 12-9-24) MS 301225 COMPLETED 20.10.26 STANDARDISATION of CHASSIS PARTS. Date 22.9.26 X No. 7205, 8305 Drawing No. Part List Description of Parts: OIL RELIEF VALVE. Origin: To improve reliability. Experimental Test Report: The new design of valve avoids the risk of stick-ing. It is also fitted in a more accessible position. Road Test Report: Run 10,000 miles on 12-EX. No failures during test of oil pressure. This is the first 10,000 miles which has been completed without relief valve having to be dismantled. Side Box Options: A Scrap and replace at all costs, including Chassis already delivered to customers B Scrap and replace on Chassis in works. C Scrap present stock and replace on Chassis not yet handed to test. D Use existing stock Alteration effective on future Chassis. Weight of Old Part. Cost of Old Part. £1. 18. 10d. Weight of New Part. Cost of New Part. £2. 2. 5d. Difference per Car. Difference per Car. £ 3. 7d. increase. Cost of Parts in Works which will be scrapped if commenced on:— Series........£........ Series........£........ Series........£........ Signature of Mr. De LOOZE that above is correct. My/RB.{R. Bowen} 19.10.26. SIGNATURES: MR. JOHNSON C.W.B., DATE: 24.9.26, REMARKS: Agreed. CWB. MR. B. JOHNSON, DATE: 20.10.26, REMARKS: Agreed. B.Johnson. MR. ROYCE, DATE: 24/9/26, REMARKS: Agreed SHR MR. WORMALD, DATE: 22.9.26, REMARKS: Agreed. Wor.{Arthur Wormald - General Works Manager} MR. ROWLEDGE, DATE: 22.9.26, REMARKS: Agreed. Rg.{Mr Rowledge} MR. DAY, DATE: 24.9.26, REMARKS: Agreed. Da.{Bernard Day - Chassis Design} MR. BAILEY, DATE: 11.10.26, REMARKS: Agreed. BY.{R.W. Bailey - Chief Engineer} MR. PLATFORD, DATE: 23.9.26, REMARKS: Agreed. EP.{G. Eric Platford - Chief Quality Engineer} MR. ELLIOTT, DATE: 25/9/26, REMARKS: Agreed EE, but the design we want to standardise is LEC-2257 which is somewhat different in arrangement to one actually tested although the valves themselves are identical. MR. NORTHEY, DATE: 23.9.26, REMARKS: Agreed. PN.{Mr Northey} MR. HIVES, DATE: 22.9.26, REMARKS: Agreed. HS.{Lord Ernest Hives - Chair} [The document is stamped with the word 'PHANTOM' in large green letters] | ||