Inspection report detailing inaccuracies on the third Wraith motor frame supplied by Rubery, Owen Ltd.
| Identifier | ExFiles\Box 8\10\ 10-page067 | |
| Date | 15th March 1937 | |
| Copy to RHC. {R. H. Coverley - Production Engineer} Copy to HPS. {Horace Percy Smith - Experimental Factory Mgr} 627 15th March 1937. Rm {William Robotham - Chief Engineer} /Smth.3/AP. Messrs Rubery, Owen Ltd., DARLASTON, Staffs. For the attention of the Motor Frame Dept. Dear Sirs, We have now completed our inspection of the third Wraith frame, and find that it is an improvement on the second one, but that there are still several inaccuracies. We give below a detailed list of these, and you will note that most of the errors fall outside the agreed tolerances. We should be glad to have your comments in due course. 1. The inner stiffener at the front end of each channel is out of position .100 rearwards. 2. When the temporary crossmember is removed, forward extremities of channels open out .250. 3. The centre section of the frame, including the cruciform member, is offset .125 from the true centre line towards left hand side. 4. The cruciform member is out of position .125 rearwards. 5. The left hand channel is not upright forward of the cruciform member. 6. The top of the right hand channel is buckled in the vicinity of the dashboard. 7. All plates on cruciform member are -.100 on 9.400 depth. 8. The slot 4.000 long in left hand plate of cruciform member is .250 out of position rearwards. 9. Spring anchor brackets FW.486/7 are .125 forward of the true position. continued | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
