From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Delivery options for a dummy chassis required for EAC 11 bodies.
Identifier | ExFiles\Box 71\1\ scan0066 | |
Date | 22th September 1924 | |
To Hs.{Lord Ernest Hives - Chair} from RHC.{R. H. Coverley - Production Engineer} X8830 RHC{R. H. Coverley - Production Engineer} 16/EU 22. 9. 24. RE EAC 11. With reference to the dummy chassis which is required for EAC 11 bodies, we could have a chassis ready for despatch a week hence if it would be accepted less radiator and bonnet. If this is not satisfactory, we could have radiator with shutters in unfinished condition by Oct. 2nd, a week on Thursday next, but at the same time, we should be glad if you would take up the question of bonnet with W.W. as our D.O. are still awaiting instructions. RHC.{R. H. Coverley - Production Engineer} | ||