Standardisation of the petrol level indicator to improve appearance and design.

Identifier  ExFiles\Box 75\2\  scan0049
Date  30th October 1923
  
R.R. 755 (10H) (SL 72 18-7-23) MP 274954B.
Handwritten top: N3596 Completed 24/11/23

STANDARDISATION of CHASSIS PARTS.

Description of Parts. PETROL LEVEL INDICATOR.

Origin: To improve appearance and design.

Experimental Test Report.
The method of holding the glass is improved - this allows the gauge to be seen more easily. A bright dial with black letters will be used to improve visibility.

Road Test Report.
Fitted to 6-G-11 - run 950 miles.
The mechanism of the gauge is exactly the same as the present one.

Weight of Old Part.
Cost of Old Part. £ 1. 7. 6

Weight of New Part.
Cost of New Part. £ 1. 8. 0

Difference per Car.
Difference per Car. £ 6 Increase.

Signature of Mr. De LOOZE that above is correct. My/JW 1.11.23.

RIGHT-HAND BOX:
X No. 3596
Drawing No.
Part List
A Scrap and replace at all costs, including Chassis already delivered to customers.
B Scrap and replace on Chassis in works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.

Cost of Parts in Works which will be scrapped if commenced on:-
Series......... £.........
Series......... £.........
Series......... £.........

APPROVALS TABLE:
SIGNATURES | DATE | REMARKS
MR. JOHNSON | 22.11 | agreed &
MR. B. JOHNSON | 23.11.23 | Agreed &
MR. ROYCE | 17.11.23 | Agreed. FHR.
MR. WORMALD | 30.10.23 | Agreed. Wor.{Arthur Wormald - General Works Manager}
MR. ROWLEDGE | 30.10.23 | Agreed. Rg.{Mr Rowledge}
MR. DAY | 1.11.23 | Agreed. Da.{Bernard Day - Chassis Design}
MR. BAILEY | 30.10.23 | Agreed. BY.{R.W. Bailey - Chief Engineer}
MR. PLATFORD | 31.10.23 | Agreed. EP.{G. Eric Platford - Chief Quality Engineer}
MR. ELLIOTT | 3.11.23 | Agreed. E.{Mr Elliott - Chief Engineer}
MR. NORTHEY | 31.10.23 | Agreed. PN.{Mr Northey}
MR. HIVES | 21.11.23 | Agreed. E.Hives.

STAMPED TEXT: 20 H.P. CHASSIS
  
  