From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Design status report for items on the Wraith II chassis.
Identifier | ExFiles\Box 161a\4\ scan0091 | |
Date | 30th June 1936 | |
(sheet 5) ITEM. DESIGN POSITION. WRAITH II CHASSIS - CONTINUED:- Tail pipe suspension. In hand. Flexible petrol pipe - dash to carburetter. Completed 26.6.36. Revised toggle shaft bearings - front brakes. Completed 25.6.36. Front brake operation. In hand. Layout of body types. In hand. Front of engine oil pipes. Completed 18.6.36. Controls between steering column and engine. In hand. Side spare wheel carrier. Completed 30.6.36. Arrangement of brake linkage layout. In hand. Engine, pressure oil filter and two stage relief valve. In hand. Dashboard, dashboard insulation and scuttle isolation. In hand. Petrol filter on rear crossmember. In hand. Rear brake countershafts at front end of rear springs. In hand. Propeller shaft. In hand. Petrol tank filler. In hand. Headlamp horns and wing stay. In hand. Front roll rod, bumper fixings, and front crossmember. In hand. | ||