Note correcting an arithmetical error in the calculation of collapsing loads for Spectre push rods.
| Identifier | ExFiles\Box 4\1\ 01-page188 | |
| Date | 15th December 1934 | |
| To- HY. {Tom Haldenby - Plant Engineer} Copy to E. {Mr Elliott - Chief Engineer} Ha/Rm. {William Robotham - Chief Engineer} JMG.H/CMR. [Text Struck Through] U. Smith Further to our note E {Mr Elliott - Chief Engineer} /PSN.3/MN.13/12/34 concerning the Spectre(Codename for Phantom III) push rod loading, we find an arithmetical error has occurred in the calculation of the collapsing load. The theoretical collapsing loads are as follows:- Present Dural rod. 390 lbs. Steel Rod. 1,150 lbs. E {Mr Elliott - Chief Engineer} /PSN. | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
